Austria – Electrical installation work – Expansion of the instrumentation and control technology at the Graz wastewater treatment plant
To ensure the electrical supply of the new process sections as well as those undergoing conversion, the electrical and instrumentation and control installation of the Graz wastewater treatment plant is to be expanded and
Opportunity description
To ensure the electrical supply of the new process sections as well as those undergoing conversion, the electrical and instrumentation and control installation of the Graz wastewater treatment plant is to be expanded and adapted in accordance with the relevant EU and ÖNORM provisions. **** A site visit must be carried out and must take place no later than 27.05.2026, with the relevant appointments to be arranged by no later than 22.05.2026 via email at gustav.hintz@holding-graz.at! **** Start of instrumentation and control construction work: approx. 01.07.2026 / Completion of instrumentation and control construction work: 14.12.2028 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.