Austria – Switchgear – 36-kV medium-voltage switchgear, Vorderwald substation
Vorarlberger Energienetze GmbH intends to completely refurbish the Vorderwald substation. The substation (from 1977) is to be brought up to the latest state of the art in the years 2028-2030. For this project, a new 36
Opportunity description
Vorarlberger Energienetze GmbH intends to completely refurbish the Vorderwald substation. The substation (from 1977) is to be brought up to the latest state of the art in the years 2028-2030. For this project, a new 36-kV, metal-enclosed, gas-insulated medium-voltage switchgear system with double busbar will be procured. For the installation of the new switchgear in the existing switchgear room, the use of a temporary switchgear system outside the operations building is planned. This procurement includes delivery, installation and commissioning of the new 36-kV switchgear. Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.