Belgium – Architectural, construction, engineering and inspection services – Study of the N382 Wielsbeke – construction of a bicycle tunnel and modification of the roads in the immediate vicinity.
1. an update of the existing project note to current standards and needs, taking into account the option of constructing turning lanes; 2. preparation of the soil mechanics and stability study and the structural plans for the bicycl
Opportunity description
1. an update of the existing project note to current standards and needs, taking into account the option of constructing turning lanes; 2. preparation of the soil mechanics and stability study and the structural plans for the bicycle tunnel; 3. preparation of the expropriation plans and the documents required for the expropriation decision; 4. preparation of the complete dossier for the environmental permit application, including dewatering; 5. preparation of the tender dossier. The subject matter of the contract is: 1. an update of the existing project note to current standards and needs, taking into account the option of constructing turning lanes; 2. preparation of the soil mechanics and stability study and the structural plans for the bicycle tunnel; 3. preparation of the expropriation plans and the documents required for the expropriation decision; 4. preparation of the complete dossier for the environmental permit application, including dewatering; 5. preparation of the tender dossier. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.