Belgium – Construction work for bridges and tunnels, shafts and subways – Special Specifications No. 57/53/4/25/170 - Line 43: Angleur / Marloie - Rivage Station - Removal of the guarded crossing by constructing an under-track passageway at km 19.855
This contract consists of the construction of an under-track passageway and its access points, replacing the guarded crossing (temporary footbridge in place). The structure beneath the tracks consists of reinforced concrete culverts made available
Opportunity description
This contract consists of the construction of an under-track passageway and its access points, replacing the guarded crossing (temporary footbridge in place). The structure beneath the tracks consists of reinforced concrete culverts made available by Infrabel at Rivage station. The work also involves the complete redevelopment of the platforms (raising, surfacing and equipment). Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.