Belgium – Electrical installation work – Framework agreement for EIA works BBEPP
Application for: Multi-year framework agreement (4 years) in 1 lot with multiple works contractors for carrying out EIA works for the Pilot Plant. The call-off assignments consist of: - Installation of electrical comp
Opportunity description
Application for: Multi-year framework agreement (4 years) in 1 lot with multiple works contractors for carrying out EIA works for the Pilot Plant. The call-off assignments consist of: - Installation of electrical components and cables Engineering support - On-site (at supplier facilities) inspection for FAT (Daily rate) - Electrical drawings services (Rate per effective page) - Electrical dimensioning Calculation - General automations services including - PLC and RIO system computing, configuration and testing - Pneumatic system configuration and testing Multi-year framework agreement (4 years) in 1 lot with multiple works contractors for carrying out EIA works for the Pilot Plant Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.