BLD-3163 Store 54 Independent Heating Solution - Delivery
High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E serv
Opportunity description
High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage. Procurement method: Restricted procedure. Estimated value: 1,000,000 GBP. Review the original Contracts Finder notice for the complete requirement, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.