Bulgaria – Air-conditioning appliances – "Supply of air conditioners and installation of air conditioners for the needs of the Sofia Directorate of Interior"
The public procurement includes: 1. Supply, installation and warranty maintenance of supplied and installed new and unused air conditioners with a capacity of 12 000 BTU and technical characteristics as follows: Refrigerant R 32; Type: Wall-mounted, inverter,
Opportunity description
The public procurement includes: 1. Supply, installation and warranty maintenance of supplied and installed new and unused air conditioners with a capacity of 12 000 BTU and technical characteristics as follows: Refrigerant R 32; Type: Wall-mounted, inverter, energy efficiency class for cooling/heating: minimum A+, operating temperature from – 10 °C or lower to + 40 °C or higher, noise level of the indoor unit at maximum fan speed < 45 dB, power supply – 230 V, 50 Hz, SEER (seasonal cooling coefficient) minimum 5.5, SCOP (seasonal heating coefficient) minimum 3.5; warranty maintenance within the warranty period – minimum 24 (twenty-four) months – unconditional and not binding the Contracting Authority to additional costs; number of air conditioners planned for supply: 289 units; 2. Supply, installation and warranty maintenance of supplied and installed new and unused air conditioners with a capacity of 18 000 BTU and technical characteristics as follows: Refrigerant R 32; Type: Wall-mounted, inverter; Energy efficiency class for cooling/heating: minimum A+; Operating temperature from – 10 °C or lower to + 40 °C or higher; noise level of the indoor unit at maximum fan speed < 45 dB; Power supply – 230 V, 50 Hz; SEER (seasonal cooling coefficient) minimum 5.5; SCOP (seasonal heating coefficient) minimum 3.5; warranty maintenance within the warranty period – minimum 24 (twenty-four) months, unconditional and not binding the Contracting Authority to additional costs; number of air conditioners planned for supply: 5 units; 3. Supply, installation and warranty maintenance of supplied and installed new and unused air conditioners with a capacity of 24 000 BT and technical characteristics as follows: Refrigerant R 32, Type: Wall-mounted, inverter; Energy efficiency class for cooling/heating: minimum A+; Operating temperature from -10 °C (or lower) to +46 °C (or higher); Noise level of the indoor unit at maximum fan speed ≤ 48 dB; Power supply – 230 V, 50 Hz; SEER (seasonal cooling coefficient) minimum 5.5; SCOP (seasonal heating coefficient) minimum 4.0; warranty maintenance within the warranty period – minimum 24 (twenty-four) months, unconditional and not binding the Contracting Authority to additional costs; number of air conditioners planned for supply: 6 units. Places for supply, installation and warranty maintenance of the equipment: in properties that are public state property, provided for management to the Sofia Directorate of Interior: administrative building of the Sofia Directorate of Interior: Sofia, 5 "Antim I" St.; administrative building of 01 District Department – Sofia Directorate of Interior: Sofia, 8 "Shipchenski Prohod" St.; administrative building of 02 District Department – Sofia Directorate of Interior: Sofia, 215 "Knyaz Boris I" St.; administrative building of 03 District Department – Sofia Directorate of Interior: Sofia, Ilinden residential district, 2 "Indzhe Voyvoda" St.; administrative building of 04 District Department – Sofia Directorate of Interior: Sofia, Lozenets residential district, 57 "Krum Popov" St.; administrative building of 05 District Department – Sofia Directorate of Interior: Sofia, 4 "Marin Drinov" St.; administrative building of 06 District Department – Sofia Directorate of Interior: Sofia, Krasno Selo residential district, 5 "Bratya Bakston" Blvd.; administrative building of 07 District Department – Sofia Directorate of Interior: Sofia, Mladost residential district, 1 "Aleksandar Malinov" Blvd.; administrative building of 08 District Department – Sofia Directorate of Interior: Sofia, Druzhba residential district, 141 "Ivan Arabadzhiyata" St.; administrative building of 09 District Department – Sofia Directorate of Interior: Sofia, Lyulin IV residential district, block 464, entrance "V"; "Specialized Police Forces" – Sofia Directorate of Interior: Sofia, Benkovski quarter, 165 "Lazar Mihaylov" St.; "Traffic Police" Department – Sofia Directorate of Interior, Sofia, 4 "Lachezar Stanchev" St. The Contracting Authority reserves the right, at its discretion, after conclusion of a contract, to exclude or add locations or require performance at only one or several of the specified locations. All possible delivery addresses are within the territory of Sofia City Province. Performance of the public procurement is carried out in 3 stages, with the Contractor supplying and installing 100 air conditioners in each stage. Staged performance is carried out within the overall term of the contract—up to 18 months from its conclusion. The commencement of performance of the 1st stage, and respectively of the overall term of the contract, shall be deemed to be the Contractor's receipt of notification that financing has been secured, information on the place/places of supply and installation (allocation) among the structures of the Sofia Directorate of Interior, and submission of a performance guarantee. Supply and installation of the equipment for the stage shall be carried out within up to 80 days from the date of submission of the performance guarantee. The commencement of performance of each subsequent stage shall be deemed to be the Contractor's receipt of an order from the Contracting Authority containing information on the place/places of supply and installation (allocation) among the structures of the Sofia Directorate of Interior. The order for each of the stages (2nd and 3rd stages) shall be sent no earlier than 60 and no later than 100 calendar days from acceptance of the performance of the preceding stage. On the basis of mutually declared readiness for performance, performance may also be ordered earlier. Supply and installation of the equipment for the stages (2nd and 3rd stages) shall be carried out within up to 80 days from receipt of the complete order (order and information on the place/places of supply and installation (allocation) among the structures of the Sofia Directorate of Interior). A detailed description of the performance stages is provided in the Draft Contract. Procedure: open. Estimated value: 207,893.31 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.