Bulgaria – Construction supervision services – “Selection of a contractor for ‘Preparation of comprehensive reports assessing compliance with the essential requirements for construction works and/or exercise of construction supervision during the execution of construction and installation works at sites within the territory of Hisarya Municipality,’ divided into lots.”
This public procurement procedure is divided into 5 (five) lots, as follows: Lot 1, comprising the following sites: SITE No. 1: “Reconstruction and improvement, incl. replacement of the street water main and building water-supply branches on Ivay
Opportunity description
This public procurement procedure is divided into 5 (five) lots, as follows: Lot 1, comprising the following sites: SITE No. 1: “Reconstruction and improvement, incl. replacement of the street water main and building water-supply branches on Ivaylo St. between centerline points 47-48-49-50-51-52-53-54-55-56 under the regulation plan of Verigovo district, Hisarya”; SITE No. 2: “Reconstruction and improvement, incl. replacement of the street water main and building water-supply branches on Baba Tonka St. in the section between Musho Mushevski St. at centerline point 38 and Steyu Bayryaktar St. at centerline point 28 under the regulation plan of Verigovo district, Hisarya”; SITE No.: 3 “Reconstruction and rehabilitation of Ivan Vazov Blvd. in the section from c.p. 42-65-64-63-62-85-86-95-106-112-113-123 under the plan of Verigovo district, Hisarya”; SITE No. 4: “Repair and rehabilitation of General Gurko Blvd. in the section from c.p. 256-320-319-327-328-303 under the plan of Hisarya, incl. replacement of the street water main and building water-supply branches”; SITE No. 5: “Repair and rehabilitation of Chataldzha St. with centerline points 97-98 and Vasil Levski St., incl. the station forecourt with centerline points 97-96-95-94-92; 93-29-28-34 under the plan of, Hisarya, incl. replacement of the street water main and building water-supply branches in the section with centerline points 98-97-96-95-94-92”; SITE No. 6: “Repair and rehabilitation of Legiya St. with centerline points 29-30-31, Georgi S. Rakovski St. with c.p. 30-32-33 under the plan of Hisarya, incl. reconstruction of the street sewerage network and building sewerage branches along Georgi S. Rakovski St.; SITE No. 7: “Repair and rehabilitation of Stryama St. in the section from c.p. 80-81-84 and Vasil Petrovich St. in the section from c.p. 85-84-83-199 under the plan of Hisarya, incl. reconstruction and replacement of the street water main and building water-supply branches.” SITE No. 8: “Reconstruction of Stryama St. in the section from c.p. 661б-61 to the walkway leading to Peace and Friendship Park under the plan of Hisarya.” Lot 2, comprising the following sites: SITE No. 1: “Repair and rehabilitation of 16th St. with centerline points 8-13-20-45-47-49-48-81-82-84 toward centerline point 87 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 2: “Repair and rehabilitation of 22nd St. and 23rd St. with centerline points 49-79-78-165-162-158-152 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 3: “Repair and rehabilitation of 21st St. with centerline points 78-80-81 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 4: “Reconstruction, repair and rehabilitation of 13th St. with centerline points 23-39-38-40-89 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 5: “Reconstruction and repair of 18th St. with centerline points 23-22-254-21-20 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 6: “Reconstruction and repair of 17th St. with centerline points 40-41-42-45 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 7: “Repair and rehabilitation of 14th St. with centerline points 22-41-85 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 8: “Repair and rehabilitation of 15th St. with centerline points 42-83-82 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; Lot 3, comprising the following sites: SITE No. 1: “Reconstruction, repair and rehabilitation of P. Kochankov St. and Zdravets St., with centerline points 1-22-11-56-55- 61-60-66 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 2: “Repair and rehabilitation of Chelibashki St. with centerline points 66-67-68-69-70-71-139-138 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 3: “Reconstruction, repair and rehabilitation of Vasil Kolarov St. with centerline points 69-135-133-134-326 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 4: “Reconstruction, repair and rehabilitation of Dimitar Blagoev St. with centerlines 139-137-136-336-338 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 5: “Reconstruction, repair and rehabilitation of Vasil Kolarov St. with centerline points 135-136 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province.” Lot 4, comprising the following sites: SITE No. 1: “Repair and rehabilitation of Miho Kabadzhov St. and Strahil St. with centerline points 147-110-111-109-108-107- 91A-91 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 2: “Reconstruction, repair and rehabilitation of Aleksandar Stamboliyski St. with centerline points 255-128-129-132-134-117-116-115-114- 112-149-142-106-107 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE 3: “Repair and rehabilitation of Ilin Doychev St. with centerline points 141-138-113-116 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 4: “Reconstruction, repair and rehabilitation of Boris Delov St. with centerline points 11-113; Bogdan Voyvoda St. with centerline points 136-135-134 and Angel Kanchev St. with centerline points 137-138 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 5: “Reconstruction, repair and rehabilitation of Todor Nachev St. with centerline points 101-102-103-114 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 6: “Reconstruction, repair and rehabilitation of Hadzhi Dimitar St. with centerline points 98-104-105 toward a street with centerline points 91-92 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 7: “Reconstruction, repair and rehabilitation of Hristo Botev St. and Ivanka Pashkulova St. with centerline points 91-92-93-94-97 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 8: “Reconstruction, repair and rehabilitation of Ivan Kalchev St. with centerline points 93-105-106 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 9: “Reconstruction, repair and rehabilitation of Dinko Stankov St. with centerline points 94-104-93 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 10: “Reconstruction, repair and rehabilitation of Kuman Doychev St. with centerline points 102-117 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province.” The information continues in the Additional information field (BT-728-Procedure). The lot includes the following sites and activities: 1. SITE No. 1: “Reconstruction and improvement, incl. replacement of the street water main and building water-supply branches on Ivaylo Street between centerline points 47-48-49-50-51-52-53-54-55-56 under the regulation plan of Verigovo district, Hisarya”; 2. SITE No. 2: “Reconstruction and improvement, incl. replacement of the street water main and building water-supply branches on Baba Tonka Street in the section between Musho Mushevski Street at centerline point 38 and Steyu Bayryaktar Street at centerline point 28 under the regulation plan of Verigovo district, Hisarya”; 3. SITE No.: 3 “Reconstruction and rehabilitation of Ivan Vazov Boulevard in the section from c.p. 42-65-64-63-62-85-86-95-106-112-113-123 under the plan of Verigovo district, Hisarya”; 4. SITE No. 4: “Repair and rehabilitation of General Gurko Boulevard in the section from c.p. 256-320-319-327-328-303 under the plan of Hisarya, incl. replacement of the street water main and building water-supply branches”; 5. SITE No. 5: “Repair and rehabilitation of Chataldzha Street with centerline points 97-98 and Vasil Levski Street, incl. the station forecourt with centerline points 97-96-95-94-92; 93-29-28-34 under the plan of, Hisarya, incl. replacement of the street water main and building water-supply branches in the section with centerline points 98-97-96-95-94-92”; 6. SITE No. 6: “Repair and rehabilitation of Legiya Street with centerline points 29-30-31, Georgi S. Rakovski Street with c.p. 30-32-33 under the plan of Hisarya, incl. reconstruction of the street sewerage network and building sewerage branches along Georgi S. Rakovski Street; 7. SITE No. 7: “Repair and rehabilitation of Stryama Street in the section from c.p. 80-81-84 and Vasil Petrovich Street in the section from c.p. 85-84-83-199 under the plan of Hisarya, incl. reconstruction and replacement of the street water main and building water-supply branches.” 8. SITE No. 8: “Reconstruction of Stryama Street in the section from c.p. 661б-61 to the walkway leading to Peace and Friendship Park under the plan of Hisarya.” Activity 1: Preparation of comprehensive reports assessing the compliance of the investment projects for the sites with the essential requirements for construction works; Activity 2: Exercise of construction supervision during the execution of construction and installation works at the sites: Sub-activity 1: Construction supervision during the execution of the sites, until their acceptance and commissioning in accordance with the requirements of the Spatial Development Act and ensuring the application of Bulgarian regulatory requirements; Sub-activity 2: Performing the function of Safety and Health Coordinator, pursuant to Ordinance No. 2 of 22.03.2004 on the minimum requirements for healthy and safe working conditions during the execution of construction and installation works; Sub-activity 3: Preparation of a technical passport pursuant to Art. 176a of the Spatial Development Act and Ordinance No. 5 of 28.12.2006 on technical passports for construction works, for the site or the relevant part thereof, if parts of the construction contract are handed over in stages. The lot includes the following sites and activities: SITE No. 1: Repair and rehabilitation of 16th Street with centerline points 8-13-20-45-47-49-48-81-82-84 toward centerline point 87 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 2: “Repair and rehabilitation of 22nd Street and 23rd Street with centerline points 49-79-78-165-162-158-152 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 3: “Repair and rehabilitation of 21st Street with centerline points 78-80-81 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province” SITE No. 4: “Reconstruction, repair and rehabilitation of 13th Street with centerline points 23-39-38-40-89 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 5: “Reconstruction and repair of 18th Street with centerline points 23-22-254-21-20 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 6: “Reconstruction and repair of 17th Street with centerline points 40-41-42-45 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 7: “Repair and rehabilitation of 14th Street with centerline points 22-41-85 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; SITE No. 8: “Repair and rehabilitation of streets 15th with centerline points 42-83-82 under the regulation plan of Krasnovo village, Hisarya Municipality, Plovdiv Province”; Activity 1: Preparation of comprehensive reports assessing the compliance of the investment projects for the sites with the essential requirements for construction works; Activity 2: Exercise of construction supervision during the execution of construction and installation works at the sites: Sub-activity 1: Construction supervision during the execution of the sites, until their acceptance and commissioning in accordance with the requirements of the Spatial Development Act and ensuring the application of Bulgarian regulatory requirements; Sub-activity 2: Performing the function of Safety and Health Coordinator, pursuant to Ordinance No. 2 of 22.03.2004 on the minimum requirements for healthy and safe working conditions during the execution of construction and installation works; Sub-activity 3: Preparation of a technical passport pursuant to Art. 176a of the Spatial Development Act and Ordinance No. 5 of 28.12.2006 on technical passports for construction works, for the site or the relevant part thereof, if parts of the construction contract are handed over in stages. The lot includes the following sites and activities: SITE No. 1: “Reconstruction, repair and rehabilitation of P. Kochankov Street and Zdravets Street, with centerline points 1-22-11-56-55-61-60-66 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 2: “Repair and rehabilitation of Chelibashki Street with centerline points 66-67-68-69-70-71-139-138 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 3: “Reconstruction, repair and rehabilitation of Vasil Kolarov Street with centerline points 69-135-133-134-326 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 4: “Reconstruction, repair and rehabilitation of Dimitar Blagoev Street with centerlines 139-137-136-336-338 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province”; SITE No. 5: “Reconstruction, repair and rehabilitation of Vasil Kolarov Street with centerline points 135-136 under the regulation plan of Panicheri village, Hisarya Municipality, Plovdiv Province.” Activity 1: Preparation of comprehensive reports assessing the compliance of the investment projects for the sites with the essential requirements for construction works; Activity 2: Exercise of construction supervision during the execution of construction and installation works at the sites: Sub-activity 1: Construction supervision during the execution of the sites, until their acceptance and commissioning in accordance with the requirements of the Spatial Development Act and ensuring the application of Bulgarian regulatory requirements; Sub-activity 2: Performing the function of Safety and Health Coordinator, pursuant to Ordinance No. 2 of 22.03.2004 on the minimum requirements for healthy and safe working conditions during the execution of construction and installation works; Sub-activity 3: Preparation of a technical passport pursuant to Art. 176a of the Spatial Development Act and Ordinance No. 5 of 28.12.2006 on technical passports for construction works, for the site or the relevant part thereof, if parts of the construction contract are handed over in stages. The lot includes the following sites and activities: SITE No. 1: “Repair and rehabilitation of Miho Kabadzhov Street and Strahil Street with centerline points 147-110-111-109-108-107-91A-91 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 2: “Reconstruction, repair and rehabilitation of Aleksandar Stamboliyski Street with centerline points 255-128-129-132-134-117-116-115-114-112-149-142-106-107 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 3: “Repair and rehabilitation of Ilin Doychev Street with centerline points 141-138-113-116 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 4: “Reconstruction, repair and rehabilitation of streets Boris Delov with centerline points 11-113; Bogdan Voyvoda with centerline points 136-135-134 and Angel Kanchev with centerline points 137-138 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 5: “Reconstruction, repair and rehabilitation of Todor Nachev Street with centerline points 101-102-103-114 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 6: “Reconstruction, repair and rehabilitation of Hadzhi Dimitar Street with centerline points 98-104-105 toward a street with centerline points 91-92 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 7: “Reconstruction, repair and rehabilitation of Hristo Botev Street and Ivanka Pashkulova Street with centerline points 91-92-93-94-97 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 8: “Reconstruction, repair and rehabilitation of Ivan Kalchev Street with centerline points 93-105-106 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province”; SITE No. 9: “Reconstruction, repair and rehabilitation of Dinko Stankov Street with centerline points 94-104-93 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province.” SITE No. 10: “Reconstruction, repair and rehabilitation of Kuman Doychev Street with centerline points 102-117 under the regulation plan of Starosel village, Hisarya Municipality, Plovdiv Province.” Activity 1: Preparation of comprehensive reports assessing the compliance of the investment projects for the sites with the essential requirements for construction works; Activity 2: Exercise of construction supervision during the execution of construction and installation works at the sites: Sub-activity 1: Construction supervision during the execution of the sites, until their acceptance and commissioning in accordance with the requirements of the Spatial Development Act and ensuring the application of Bulgarian regulatory requirements; Sub-activity 2: Performing the function of Safety and Health Coordinator, pursuant to Ordinance No. 2 of 22.03.2004 on the minimum requirements for healthy and safe working conditions during the execution of construction and installation works; Sub-activity 3: Preparation of a technical passport pursuant to Art. 176a of the Spatial Development Act and Ordinance No. 5 of 28.12.2006 on technical passports for construction works, for the site or the relevant part thereof, if parts of the construction contract are handed over in stages. The lot includes the following sites and activities: 1. SITE No. 1 “Repair and rehabilitation of Third of March Street between Nikola Vaptsarov Street and Petko Karavelov Street with c.p. 76-77-78-232-230 under the plan of Hisarya”; 2. SITE No. 2 “Repair and rehabilitation of Petko Karavelov Street in the section from c.p. 237-238-239-230-229 under the plan of Hisarya.” 3. “SITE No. 3 Repair and rehabilitation of Petko Karavelov Street and Rose Valley Street in the section from c.p. 229 -213-214-211-210-209 under the plan of Hisarya.” 4. SITE No. 4 “Reconstruction and rehabilitation of The 9 Children of Eani Street in the section from c.p. 61-197 under the plan of Hisarya.” 5. SITE No. 5 “Repair and rehabilitation of Zdravets Street between Stara Planina Street and General Totleben Street in the section from c.p. 16-267-17-268-269-270-29-271-158 under the plan of Hisarya, Momina Banya district.” Activity 1: Preparation of comprehensive reports assessing the compliance of the investment projects for the sites with the essential requirements for construction works; Activity 2: Exercise of construction supervision during the execution of construction and installation works at the sites: Sub-activity 1: Construction supervision during the execution of the sites, until their acceptance and commissioning in accordance with the requirements of the Spatial Development Act and ensuring the application of Bulgarian regulatory requirements; Sub-activity 2: Performing the function of Safety and Health Coordinator, pursuant to Ordinance No. 2 of 22.03.2004 on the minimum requirements for healthy and safe working conditions during the execution of construction and installation works; Sub-activity 3: Preparation of a technical passport pursuant to Art. 176a of the Spatial Development Act and Ordinance No. 5 of 28.12.2006 on technical passports for construction works, for the site or the relevant part thereof, if parts of the construction contract are handed over in stages. Procedure: open. Estimated value: 224,000 BGN. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.