Bulgaria – Grinding machines – “Supply of mobile equipment in five separate lots under the Environment Programme 2021-2027, pursuant to Contract BG16FFPR002-2.004-0017-C01 dated 09.11.2025.”
“Supply of mobile equipment in five separate lots: Separate lot No. 1 - Compost windrow turner – 1 pc. Separate lot No. 2 - Mobile crusher – shredder 22 hp and 75 hp – 2 pcs. Separate lot No. 3 - Compost scre
Opportunity description
“Supply of mobile equipment in five separate lots: Separate lot No. 1 - Compost windrow turner – 1 pc. Separate lot No. 2 - Mobile crusher – shredder 22 hp and 75 hp – 2 pcs. Separate lot No. 3 - Compost screen with a capacity of min. 6000 tonnes per year – 1 pc. Separate lot No. 4 - Front loader – 1 pc. Separate lot No. 5 - Mini front loader – 1 pc. The subject matter of the procurement also includes the provision of warranty (service) maintenance for the supplied equipment during the warranty period. 2.1.Technical maintenance and repair Technical maintenance and repair of the equipment shall be carried out on site, and where this is not possible - at the contractor’s service facility (owned or leased) authorized by the manufacturer(s), within the country, during the warranty periods and warranty (service) maintenance. 2.2.Other requirements 2.2.1. The equipment shall be accompanied by instructions or an operating manual in Bulgarian. 2.2.2. The equipment shall be accompanied by documents certifying its quality and origin and the documents necessary for its registration. 2.3. Warranty liability and warranty requirements. 2.3.1. The contractor shall guarantee the full functional fitness of the supplied equipment in accordance with its intended purpose and the technical specifications. 2.3.2. Full warranty service provided for a period of at least 12/twelve/ months. 2.3.3 The warranty period shall commence from the date of signing an acceptance and handover protocol for the delivery without remarks. The tenderer shall provide a statement of technical maintenance during the warranty period, including consumables, materials, labor and transport to the place of delivery. Engine: Diesel, water-cooled, 4-cylinder, compliant with Stage V standard or equivalent; Engine displacement- From 1850 cm3 To 1950 cm3; Engine power- From 42 to 44 kW; Engine cooling system Reversible engine cooling fan system; Chassis- Operating weight- Not more than 3250 kg.; Transport length- Not less than 3400 mm.; Width-Not more than 1700 mm; Height- Not more than 2000 mm.; Travel speed- Not less than 16 km/h; Electrical system: Power supply- 12V; Work lights- Standard configuration; Audible signal during operation- Included; Hydraulic system: Hydraulic pump – type; Main hydraulic pump – Gear pump and axial-piston hydraulic motors for travel; Hydraulic pump flow rate- From 68 to 78 l.; Excavator equipment controls- With joysticks; Cab and service capacities: Construction and safety. Providing operator protection in the event of machine rollover and from falling objects, ROPS and FOPS standards; Access door- 1 pc.; Heating and ventilation- With air conditioning; Fuel tank, capacity- Not less than 90 l.; Coolant, capacity- Not more than 10 l.; Hydraulic system, capacity- Not more than 45 l.; Loader equipment: Single-arm loader equipment: Maximum bucket dumping height- Not more than 2300 mm Automatic bucket leveling system- Included; Load capacity: Additional attachment equipment for the machine- Not less than 700 kg; Opening loader bucket-Pallet forks; 2.1.Technical maintenance and repair Technical maintenance and repair of the equipment shall be carried out on site, and where this is not possible - at the contractor’s service facility (owned or leased) authorized by the manufacturer(s), within the country, during the warranty periods and warranty (service) maintenance. 2.2.Other requirements 2.2.1. The equipment shall be accompanied by instructions or an operating manual in Bulgarian. 2.2.2. The equipment shall be accompanied by documents certifying its quality and origin and the documents necessary for its registration. 2.3. Warranty liability and warranty requirements. 2.3.1. The contractor shall guarantee the full functional fitness of the supplied equipment in accordance with its intended purpose and the technical specifications. 2.3.2. Full warranty service provided for a period of at least 12/twelve/ months. 2.3.3 The warranty period shall commence from the date of signing an acceptance and handover protocol for the delivery without remarks. The tenderer shall provide a statement of technical maintenance during the warranty period, including consumables, materials, labor and transport to the place of delivery. Procedure: open. Estimated value: 1,152,550 BGN. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.