B2Bounty
Loading business workspace…Authorization and release eligibility are being checked.
Bulgaria – Road construction works – “Selection of a contractor for the design, exercise of designer's supervision and construction /engineering/ of the site: Construction of a new road variant from km 212+500 /design kilometer/ to km 213+060 /design kilometer along the new route/, a new bridge structure at km 212+870 /design kilometer along the new route/ over the Sredetska River and...” /Continues in the “Additional information” field (VT-300-Procedure), item 1/ | B2Bounty