Bulgaria – Water plumbing work – “ENGINEERING WORKS FOR THE RECONSTRUCTION OF THE WATER SUPPLY NETWORK IN THE VILLAGE OF ELENOVO, NOVA ZAGORA MUNICIPALITY, ALONG STREETS – SECTION 2”
Reconstruction is planned of the existing street water mains together with the building water supply connections along streets from point 155 to point 160, from point 156 to point 157, from point 137 to point 158, from point 96 to point 135, from point 132 to point 123
Opportunity description
Reconstruction is planned of the existing street water mains together with the building water supply connections along streets from point 155 to point 160, from point 156 to point 157, from point 137 to point 158, from point 96 to point 135, from point 132 to point 123, from point 133 to point 134, from point 124 to point 129, from point 130 to point 139, point 131 to point 125, from point 107 to point 109, from point 123 to point 88, from point 111 to point 67, from point 112 to point 118, from point 89 to point 88, from point 75 to point 88, according to the development plan of the village of Elenovo. Scope of the reconstruction in the settlement: The total approximate length of the street water supply network is about 3850.00 m, with the approximate lengths by diameter being: φ110 HDPE – 320.00 m, φ90 HDPE – 3530.00 m. The building water supply connections will be predominantly φ32 HDPE, with an approximate length of 1540.00 m. Restoration of affected road surfaces to the existing ground level: Asphalt: approximately 3630.00 m; Macadam: approximately 220.00 m. The routes are entirely and exclusively within the development boundaries of the settlement. The metered quantities of water supplied to the settlement will be provided as input information for the preparation of the technical design. The technical specification describes in detail the diameters and types of pipes that have the required hydraulic capacity, and the specified diameters must be adhered to. The old, worn-out pipes are to be replaced with equivalent HDPE PN10 SDR17 pipes. All water mains subject to reconstruction have routes located entirely and exclusively within the development boundaries of the settlement, which does not require the preparation of a Detailed Development Plan – Parcel Plan or a Detailed Development Plan – spatial development scheme. The routes subject to reconstruction are located exclusively on public municipal territory. Where there is a crossing through a drainage ravine, the method of crossing must be presented at the technical design stage. The routes do not pass through specific infrastructure facilities. The technical specification describes in detail the lengths and diameters that are equivalent to those of the worn-out water supply network, which is sufficient for analysis of the newly designed network. Procedure: open. Estimated value: 3,257,304.16 BGN. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.