Czechia – Boilers – Construction, supply and commissioning of biomass boiler K2
The subject is the construction, supply and commissioning of biomass boiler K2 at the Žďárského industrial zone site, Kožichovice-Třebíč, on the premises of the KEC energy center in the production plant area. The subject is the design proposal for the solution, supply, manufacture, installation and c
Opportunity description
The subject is the construction, supply and commissioning of biomass boiler K2 at the Žďárského industrial zone site, Kožichovice-Třebíč, on the premises of the KEC energy center in the production plant area. The subject is the design proposal for the solution, supply, manufacture, installation and commissioning of a new K2 boiler with a thermal output of 2-2.4 MWt. It will also include a fuel storage bin, ash handling system, flue gas cleaning, connection to the existing distribution systems and control system, incl. the construction part comprising the cladding of the building for the new K2 operation. The design proposal must take into account connection to the district heating system and coordination of the operation of the cogeneration center, biomass boiler K1 and heat pumps. The construction part will also include the switchgear room of the K2 boiler, which will be located outside the building but structurally separated from the operating area, the reason being protection against dust and temperatures and operational hygiene. Procedure: open. Estimated value: 17,500,000 CZK. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.