Czechia – Electronic, electromechanical and electrotechnical supplies – Brno public charging station network – NAB AC purchase stage – 2026
The contracting authority intends to build a network of public charging stations for electric vehicles in the territory of the city of Brno. Through this public contract, the contracting authority is commissioning the supply of stations. The contracting authority will arrange for the necessary construction modifications to be carried out for the installation of the station. The subject matter
Opportunity description
The contracting authority intends to build a network of public charging stations for electric vehicles in the territory of the city of Brno. Through this public contract, the contracting authority is commissioning the supply of stations. The contracting authority will arrange for the necessary construction modifications to be carried out for the installation of the station. The subject matter of the public contract Construction of a network of standard charging stations for electric vehicles in the city of Brno – “Brno public charging station network – NAB AC purchase stage – 2026” is the purchase of charging stations for electric vehicles with an AC 22kW charging point in accordance with the specified parameters set out in the tender documentation. These are pedestal and wallbox charging stations equipped with two charging points or one charging point. Charging stations with two charging points must allow the simultaneous (parallel) charging of two electric vehicles while maintaining the declared power outputs at the individual AC outputs. The charging stations must allow dynamic adjustment of the charging power output to values lower than the station’s rated parameters (dynamic load management) for the purpose of controlling power according to the operating status or ensuring compliance with the maximum available power input of the station’s consumption point at the location. An integral part of the supply is transport, installation, commissioning of the charging stations, verification of their functionality, the documentation part in accordance with the tender documentation, and warranty service throughout the warranty period. The supply of charging stations for electric vehicles does not include work related to preparing the site for the placement of the charging station (i.e. in particular the electricity supply, the foundation for the charging stations, etc.). The technical parameters of the offered stations must comply with the Technical Specification. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.