Czechia – Project and design preparation, estimation of costs – Simplified project documentation
The subject matter of the public contracts awarded under the established DNS will be the preparation of simplified project documentation and related engineering activities, technical support, design supervision and related services in connection with the provision of generally non-inv
Opportunity description
The subject matter of the public contracts awarded under the established DNS will be the preparation of simplified project documentation and related engineering activities, technical support, design supervision and related services in connection with the provision of generally non-investment maintenance work and repairs related to the routine maintenance of entrusted assets. These may also be awarded as a set of planned activities for a given period. The preparation of simplified project documentation includes the preparation of investor budgets and bills of works and services, generally prepared according to OTSKP price lists, or alternatively ÚRS or operational and other price lists as required by the contracting authority. The use of items for engineering activities is necessary, for example, when dealing with authorities concerning various types of permits, negotiating access, temporary occupation, etc. Given the lower level of complexity, small scope and relatively low value of the individual contracts, the so-called White Book of Contractual Conditions will not be used for this type of documentation. Maintenance work within the meaning of routine maintenance generally does not require the preparation of project documentation pursuant to the Directive, and the scope of the work will be specified by the specific contract. Simplified project documentation may be required not only for construction work but also for services. In particular, this includes, for example, the cleaning of ditches or other structures requiring the preparation of a more detailed, time-consuming inventory survey before the maintenance work itself is commissioned, which the Contracting Authority cannot provide due to capacity constraints. The precise specification will be stated in the specific contract. Contracts will be concluded by the individual operational units of the Contracting Authority, as needed, for one or more planned activities, generally for a period of one year, according to the plan of activities for the following period. This concerns the assessment and proposed optimization of the level of road traffic safety and flow at the existing accident-prone four-arm at-grade intersection of roads I/17, I/37 and III/3587 east of Chrudim in the direction of Kočí. The objective of the assessment is to optimize the level of road traffic safety and flow at the existing four-arm at-grade intersection (operational chainage km 34.693) and propose a solution that can be implemented. The subject matter of the public contracts awarded under the established DNS will be the preparation of simplified project documentation and related engineering activities, technical support, design supervision and related services in connection with the provision of generally non-investment maintenance work and repairs related to the routine maintenance of entrusted assets. These may also be awarded as a set of planned activities for a given period. The preparation of simplified project documentation includes the preparation of investor budgets and bills of works and services, generally prepared according to OTSKP price lists, or alternatively ÚRS or operational and other price lists as required by the contracting authority. The use of items for engineering activities is necessary, for example, when dealing with authorities concerning various types of permits, negotiating access, temporary occupation, etc. Given the lower level of complexity, small scope and relatively low value of the individual contracts, the so-called White Book of Contractual Conditions will not be used for this type of documentation. Maintenance work within the meaning of routine maintenance generally does not require the preparation of project documentation pursuant to the Directive, and the scope of the work will be specified by the specific contract. Simplified project documentation may be required not only for construction work but also for services. In particular, this includes, for example, the cleaning of ditches or other structures requiring the preparation of a more detailed, time-consuming inventory survey before the maintenance work itself is commissioned, which the Contracting Authority cannot provide due to capacity constraints. The precise specification will be stated in the specific contract. Contracts will be concluded by the individual operational units of the Contracting Authority, as needed, for one or more planned activities, generally for a period of one year, according to the plan of activities for the following period. Procedure: restricted. Estimated value: 100,000,000 CZK. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.