France – Architectural services for buildings – Project management assignment for the complete renovation of Building A: teaching facilities and kitchen, and 3 dwellings at Olivier Messiaen Middle School in Mortagne-sur-Sèvre
The works are divided into 13 themes: Replacement of exterior joinery, Installation of a dual-flow ventilation system, Installation of external insulation, Reinforcement of the insulation of the upper floors, Renovation of the CD
Opportunity description
The works are divided into 13 themes: Replacement of exterior joinery, Installation of a dual-flow ventilation system, Installation of external insulation, Reinforcement of the insulation of the upper floors, Renovation of the CDI, Renovation of the study hall, 2 technology rooms and 1 multimedia room, Refurbishment of the circulation areas and administration area, Renovation of 2 science rooms, Renovation of the kitchen, Reinforcement of roof insulation with glazed roofs, Optimization of lighting sources, Refurbishment of general-purpose classrooms, Repainting of the 3 staff dwellings. The budget allocated to the works is 5,000,000 euro(s) excluding tax, September 2025 value Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.