France – Building construction work – DESIGN-BUILD CONTRACT FOR THE PARTIAL DEVELOPMENT OF THE PAUL BERT BLOCK - Application phase: MAJOR RESTRUCTURING, EXTENSION AND VERTICAL EXTENSION OF THE PAUL BERT SCHOOL COMPLEX, CREATION OF AN ADMINISTRATIVE CENTER AND AN ASSOCIATED PARKING FACILITY IN BOIS-COLOMBES
DESIGN-BUILD CONTRACT FOR THE PARTIAL DEVELOPMENT OF THE PAUL BERT BLOCK: MAJOR RESTRUCTURING, EXTENSION AND VERTICAL EXTENSION OF THE PAUL BERT SCHOOL COMPLEX, CREATION OF AN ADMINISTRATIVE CENTER AND AN ASSOCIATED PARKING FACILITY IN BOIS-COLOMBES The
Opportunity description
DESIGN-BUILD CONTRACT FOR THE PARTIAL DEVELOPMENT OF THE PAUL BERT BLOCK: MAJOR RESTRUCTURING, EXTENSION AND VERTICAL EXTENSION OF THE PAUL BERT SCHOOL COMPLEX, CREATION OF AN ADMINISTRATIVE CENTER AND AN ASSOCIATED PARKING FACILITY IN BOIS-COLOMBES The purpose of this contract is the design and construction, in several phases, of the following facilities: -Major restructuring, extension and vertical extension of the Paul Bert school complex: -approx. 2,000 m² to be partially demolished (structure and façades retained), -approx. 4,000 m² to be completely demolished, -approx. 4,800 m² SU to be restructured/vertically extended, constructed, -approx. 3,000 m² of outdoor spaces to be developed (playgrounds, forecourt, service lane in the heart of the block). -Creation of an administrative center: -approx. 1,500 m² SU to be constructed, -Construction of an underground parking facility associated with the administrative center, with approx. 60 spaces. -Development of the block's outdoor spaces (redevelopment of Paul Déroulède and Auguste Moreau streets alongside the block). The contract includes: - Phase 1: Design (project management assignment) Finalization of the APS+ - APD - PC - PRO - Phase 2: Construction (project management assignment during execution and performance of the works) Project management assignment: DET - VISA - EXE - OPC - AOR Performance of all-trades works, namely: - Preparatory asbestos-removal, demolition and earthworks - Site installations - Management, - Modular construction works, - Infrastructure and superstructure works (underpinning, vertical extension) - Building-envelope works (including façade renovation), - Finishing works, - Technical work packages, - Supply and installation of equipment, including exterior and interior signage. - VRD and landscaping and outdoor works - DOE, updating of energy notices and air-tightness tests, acoustic study at the completed works/acceptance phase. The purpose of this contract is the design and construction, in several phases, of the following facilities: -Major restructuring, extension and vertical extension of the Paul Bert school complex -approx. 2,000 m² to be partially demolished (structure and façades retained), -approx. 4,000 m² to be completely demolished, -approx. 4,800 m² SU to be restructured/vertically extended, constructed, -approx. 3,000 m² of outdoor spaces to be developed (playgrounds, forecourt, service lane in the heart of the block). -Creation of an administrative center: -approx. 1,500 m² SU to be constructed, -Construction of an underground parking facility associated with the administrative center, with approx. 60 spaces. -Development of the block's outdoor spaces (redevelopment of Paul Déroulède and Auguste Moreau streets alongside the block). The contract includes: - Phase 1: Design (project management assignment) Finalization of the APS+ - APD - PC - PRO - Phase 2: Construction (project management assignment during execution and performance of the works) Project management assignment: DET - VISA - EXE - OPC - AOR Performance of all-trades works, namely: - Preparatory asbestos-removal, demolition and earthworks - Site installations - Management, - Modular construction works, - Infrastructure and superstructure works (underpinning, vertical extension) - Building-envelope works (including façade renovation), - Finishing works, - Technical work packages, - Supply and installation of equipment, including exterior and interior signage. - VRD and landscaping and outdoor works - DOE, updating of energy notices and air-tightness tests, acoustic study at the completed works/acceptance phase. It is awarded at a fixed global lump-sum price. Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.