France – Building construction work – Restructuring and extension of Les Hautes Vignes secondary school in SELONCOURT
Each lot will be awarded separately. The services are paid for at fixed prices. The overall period planned for the performance of all services is 61.5 months, broken down as follows: - Preparation period
Opportunity description
Each lot will be awarded separately. The services are paid for at fixed prices. The overall period planned for the performance of all services is 61.5 months, broken down as follows: - Preparation period: 2 months from the date of the commencement service order (OS), - Works performance period: 47.5 months from the date of the commencement OS, - 12-month perfect completion guarantee period. The overall period of 61.5 months (as defined in the CCAP) must therefore be taken into account. The date of 07/12/2026 indicated in this notice corresponds to an estimated date for notification of the contract DECONSTRUCTION - ASBESTOS REMOVAL - STRIPPING<br/> GENERAL EARTHWORKS - ROADS AND UTILITIES - EXTERNAL WORKS<br/> STRUCTURAL WORKS <br/> TIMBER FRAMEWORK<br/> FACADE TREATMENT - CLADDING - DRY ROOFING<br/> WATERPROOFING<br/> WOOD / ALUMINIUM EXTERNAL JOINERY<br/> METALWORK - LOCKSMITHING<br/> INTERNAL WOOD JOINERY<br/> PARTITIONS - LININGS - PAINTING<br/> SUSPENDED CEILINGS<br/> HARD COVERINGS<br/> RESILIENT FLOOR COVERINGS<br/> KITCHEN EQUIPMENT<br/> PHOTOVOLTAICS<br/> ELECTRICITY <br/> HEATING VENTILATION - SANITARY INSTALLATIONS<br/> TEMPORARY PREMISES<br/> Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.