France – Dual carriageway construction work – Canton of Dieppe 2 - Municipalities of Dieppe, Grèges, Martin-Eglise, Ancourt, Petit-Caux - Departmental Road No. 925 - Development between Dieppe and Saint-Martin-en-Campagne (delegated municipality of Petit-Caux) Earthworks, drainage, roadways, equipment and road markings
The consultation is divided into two technical phases as follows: - Phase No. 1: RD 925 - Conversion to a 2 x 2 lane road between Dieppe and Saint-Martin-en-Campagne (delegated municipality of Petit Caux) - Phase No. 2: RD 925 - Construction of a rounda
Opportunity description
The consultation is divided into two technical phases as follows: - Phase No. 1: RD 925 - Conversion to a 2 x 2 lane road between Dieppe and Saint-Martin-en-Campagne (delegated municipality of Petit Caux) - Phase No. 2: RD 925 - Construction of a roundabout - Access to the Eurochannel III Zone - Municipalities of Petit Caux and Martin Église The performance period for the services is set by the contracting authority under the conditions below. The performance period for the services for technical phase No. 1 is set at 18 months from the service order to commence the work for the phase. The performance period for the services for technical phase No. 2 is set at 4 months from the service order to commence the work for the phase. If the technical phases overlap, the overall performance period for the services shall not exceed 18 months. A preparation period is established. By way of derogation from Article 28.1 of the CCAG Travaux, this preparation period is not included in the performance period. Its duration is 90 days from notification of the contract Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.