France – Electrical wiring and fitting work – Low-Current Systems (CFA) Contract along the line and at the T13 Maintenance and Storage Facility, Phase 2
The Low-Current Systems contract along the Line and at the Versailles Matelots Maintenance and Storage Facility (SMR), referred to as the “CFA” contract, comprises the following services: At the Versailles-Matelots SMR: - Extension of the central systems at the LT-PCC li
Opportunity description
The Low-Current Systems contract along the Line and at the Versailles Matelots Maintenance and Storage Facility (SMR), referred to as the “CFA” contract, comprises the following services: At the Versailles-Matelots SMR: - Extension of the central systems at the associated LT-PCC relating to: Video surveillance; Intercom and telephony; - Extension of the RMS; - Extension of the GMAO; - On the Phase 1 line section: - Adaptation of the RMS ring enabling extension to Phase 2. - On the Phase 2 line section: - Supply, installation, connection and commissioning of: - CFA cabinets in passenger stations; - The RMS infrastructure; - Video surveillance equipment; - Intercoms; - Telephones in technical rooms; - Passenger Information equipment (BIV); - Station public-address systems; - New TETRA Radio antennas; At the Poissy CdMU: Supply, installation, connection and commissioning of CFA systems excluding building systems: - RMS site integrated into the T13 ring; - Video surveillance; - Telephony; - Operator workstations. Regarding Supervision, the scope is as follows: - On the Phase 2 line section: supply of GTC programmable logic controllers (1 per station) under the CFA contract The Low-Current Systems contract along the Line and at the Versailles Matelots Maintenance and Storage Facility (SMR), referred to as the “CFA” contract, comprises the following services: At the Versailles-Matelots SMR: - Extension of the central systems at the associated LT-PCC relating to: Video surveillance; Intercom and telephony; - Extension of the RMS; - Extension of the GMAO; On the Phase 1 line section: - Adaptation of the RMS ring enabling extension to Phase 2. On the Phase 2 line section: - Supply, installation, connection and commissioning of: CFA cabinets in passenger stations; The RMS infrastructure; Video surveillance equipment; Intercoms; Telephones in technical rooms; Passenger Information equipment (BIV); Station public-address systems; New TETRA Radio antennas; At the Poissy CdMU: Supply, installation, connection and commissioning of CFA systems excluding building systems: - RMS site integrated into the T13 ring; - Video surveillance; - Telephony; - Operator workstations. Regarding Supervision, the scope is as follows: - On the Phase 2 line section: supply of GTC programmable logic controllers (1 per station) under the CFA contract Procedure: open. Estimated value: 0 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.