France – Engineering services – Project management for improving the operation of the Doubs wastewater treatment plant
The contract with optional phases will be concluded pursuant to Articles R. 2113-4 to R. 2113-6 of the French Public Procurement Code. It comprises 3 phases of work: - Phase 1: o Rehabilitation of the clarifiers. Installation of isolation valves o Prod
Opportunity description
The contract with optional phases will be concluded pursuant to Articles R. 2113-4 to R. 2113-6 of the French Public Procurement Code. It comprises 3 phases of work: - Phase 1: o Rehabilitation of the clarifiers. Installation of isolation valves o Production of industrial water - Phase 2: o Construction of a building at the inlet of the treatment line for effluent pretreatment and for the workshop for receiving septic tank waste and sewer-cleaning waste o Demolition/dismantling of abandoned structures - Phase 3: o Integration of a sludge densification process and replacement of the fine screens o Replacement of the process air production equipment o Rehabilitation of the biomaster civil engineering works o Construction of a structure near the DDCs and the biomaster, dedicated to sand washing and aeration o Securing the temporary stone removal and screening structure in the external overflow weir (external DO) o Construction of a new equipment storage building. The duration of the works (DET assignment), also including the VISA and AOR assignments, will be as follows: - Phase 1: 10 months - Phase 2: 14 months - Phase 3: 14 months no variants authorized Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.