France – Footbridge construction work – Construction work for a pedestrian footbridge
Construction work for a footbridge dedicated to soft mobility modes for pedestrians and cyclists over the Isère, upstream of the A480 viaduct, in Grenoble and Saint Martin le Vinoux This consultation concerns the construction work for a footbridge fo
Opportunity description
Construction work for a footbridge dedicated to soft mobility modes for pedestrians and cyclists over the Isère, upstream of the A480 viaduct, in Grenoble and Saint Martin le Vinoux This consultation concerns the construction work for a pedestrian and cycle footbridge over the Isère, upstream of the A480 viaduct, in Grenoble and Saint-Martin-le-Vinoux. The contract also includes the metal access ramps and connections to the existing cycle paths on the right and left banks of the Isère. The project comprises approximately 200 tonnes of structural steelwork in total, together with the associated supports and deep foundations. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.