France – Installation of road lighting equipment – BOCCACABANA PHASE V Renovation of public lighting
The contract start date is provided for information purposes only. The performance period is 14 weeks, excluding the preparation period (30 days) and maintenance period (40 days). The purpose of this contract is the supply and installation of all
Opportunity description
The contract start date is provided for information purposes only. The performance period is 14 weeks, excluding the preparation period (30 days) and maintenance period (40 days). The purpose of this contract is the supply and installation of all public lighting fixtures and the completion of the associated electrical installations, as part of the Boccacabana Phase V project, at the following two sites: - Seafront Site (Kiosk 22 area - pedestrian access to the beach car park); - Bd Leader / Av. A. Pascal Car Parks and Esplanade du Golfe Site. The services include the removal of the existing installations as well as the supply, installation, wiring, connection and commissioning of the public lighting equipment provided for under this contract. The services are paid for at unit prices Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.