France – Road tunnel construction work – Rehabilitation of the Mont Blanc Tunnel vault
This consultation concerns the rehabilitation of the Mont Blanc Tunnel vault over four separate sections located adjacent to garages G12, G17, G25 and G27, for a total length of 674 metres. The services include, in particular
Opportunity description
This consultation concerns the rehabilitation of the Mont Blanc Tunnel vault over four separate sections located adjacent to garages G12, G17, G25 and G27, for a total length of 674 metres. The services include, in particular, preparatory operations, vault deconstruction and reconstruction work, waterproofing and drainage systems, as well as restoration and re-equipment work. The contract is performed in a cross-border road structure located in French and Italian territories. It comprises one firm tranche and two optional tranches. The overall estimated duration of the contract is 36 months. The estimated value of the contract is approximately 40.5 M excluding tax. Rehabilitation work on the Mont Blanc Tunnel vault over four separate sections located adjacent to garages G12, G17, G25 and G27, for a total length of 674 metres. The services include, in particular, preparatory operations, vault deconstruction and reconstruction work, waterproofing and drainage systems, as well as restoration and re-equipment work. The contract is performed in a cross-border road structure located in French and Italian territories. It comprises one firm tranche and two optional tranches. The overall estimated duration of the contract is 36 months. The estimated value of the contract is approximately 40.5 M excluding tax. Procedure: open. Estimated value: 40,500,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.