France – Sewerage work – SECURING THE KERGULVEN PUMPING STATION: Construction of two pumping stations and renewal of the sewerage networks
The works consist of supplying and installing the equipment and structures necessary for the proper functioning of the system, namely: • The construction of a pumping station to collect wastewater from the town, with a tank of at least 120 m3 (Tingo
Opportunity description
The works consist of supplying and installing the equipment and structures necessary for the proper functioning of the system, namely: • The construction of a pumping station to collect wastewater from the town, with a tank of at least 120 m3 (Tingoff pumping station) • The construction of a pumping station to collect wastewater from the Verouri Nevez housing development (Verouri Nevez pumping station) • The supply and installation of 775 ml of gravity sewer network in the Eau Blanche valley • The supply and installation of 1470 ml of DN 150 rising main for the Tingoff pumping station along the Hent Trebe path and the Route des Châteaux in Plomelin • The supply and installation of 970 ml of DN 75 rising main for the Verouri Nevez pumping station, Chemin de Kerfram and Route des Châteaux in Plomelin • The asbestos removal of approximately 480 ml of DN125 asbestos-cement network Networks Pumping stations Procedure: open. Estimated value: 900,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.