France – Waste disposal site construction work – EXTENSION WORKS FOR THE WESTERN NON-HAZARDOUS WASTE STORAGE FACILITY IN SAINT LAURENT DU MARONI - 2026-2027 PHASE
EXTENSION WORKS FOR THE WESTERN NON-HAZARDOUS WASTE STORAGE FACILITY IN SAINT LAURENT DU MARONI - 2026-2027 PHASE Lot 1: Earthworks for cells C3 and C4 and construction of related structures. Lot 2: Waterproofing of the cells
Opportunity description
EXTENSION WORKS FOR THE WESTERN NON-HAZARDOUS WASTE STORAGE FACILITY IN SAINT LAURENT DU MARONI - 2026-2027 PHASE Lot 1: Earthworks for cells C3 and C4 and construction of related structures. Lot 2: Waterproofing of cells C3 and C4 and their related structures. Lot 3: Redevelopment of cell C2c. Firm tranche: Earthworks for cell C3 and construction of the related structures necessary for its operation, commissioning, hydraulic management, and operational safety. Optional tranche 1: Earthworks for cell C4. Firm tranche: Waterproofing of cell C3 and the related structures under Lot 2, in particular the BEP4 stormwater basin. Optional tranche 1: Waterproofing of cell C4 and performance of the related services under Lot 2. Firm tranche: Redevelopment of cell C2c, including in particular the cover layers, the geosynthetic waterproofing system, the biogas collection networks, the leachate reinjection network, connections, inspections, tests, and DOE. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.