France – Works for complete or part construction and civil engineering work – Development of the RN2 and between the Bourbier interchange and the Plaines roundabout in Saint-Benoît - Lot 1: Preliminary Works Civil Engineering - Roads and Utilities - Demolitions
The following infrastructure will be constructed as part of the project: - the creation of two bidirectional dedicated-lane Public Transport (TCSP) lanes, - the creation of a Multimodal Transport Hub (PEM) associated with a Parking-Rel
Opportunity description
The following infrastructure will be constructed as part of the project: - the creation of two bidirectional dedicated-lane Public Transport (TCSP) lanes, - the creation of a Multimodal Transport Hub (PEM) associated with a Park-and-Ride Facility (P+R) at the Plaines roundabout, - the creation of a pedestrian and cycle path to accommodate the Regional Cycle Route (VVR), - the conversion of general traffic to 2×2 lanes on the section concerned (creation of 2 additional lanes), - the creation of a new Non-Standard Engineering Structure (OANC) over the Marsouins River to accommodate two general traffic lanes, two lanes dedicated to Public Transport and the Regional Cycle Route, - work on the five interchanges along the route (Bourbier interchange, Beaulieu interchange, Leconardel half-interchange, Bras Canot intersection, Plaines roundabout), - high-quality landscaping, as well as work on crossings for active modes and the mitigation of nuisances (particularly noise), ensuring the integration of this major route into its urban environment, Finally, this project is associated with a restructuring of the local and interurban bus networks (Estival, Car Jaune), particularly in connection with the functionalities offered by this new infrastructure. The works consist of: - site installation, which notably includes the regulatory SPS site signs, land development, including the supply and implementation of materials for the construction of site installation platforms, storage areas, deposit areas, development of specific access points on the public road, their maintenance and cleaning, drainage and maintenance of these general and supplementary site tracks and platforms, electrical installations, shared safety and hygiene installations, non-exhaustive list - phasing including nights and temporary works: securing the execution of the works, investigations, supply, installation, implementation, maintenance, modifications according to the phasing of horizontal and vertical signage (regulatory, directional and informational); as well as removal, dismantling, erasure, demolition, reinstatement at the end of the intervention, guarding, reinstatement at the end of each phase and at the end of the works, all costs necessary for assignments and interventions ...., maintenance, implementation of all safety equipment, marking, supply and implementation of fencing on mobile safety barriers, non-exhaustive list - Supply and installation of a site information sign, - Supply and installation of a communication information sign including the characteristics of the contract - Report by an approved bailiff certifying the condition of neighboring structures, .... - Internal inspection including site laboratory, - Waste treatment management - Temporary drainage during the construction phase (developments related to stormwater management within the works footprint, environmental preservation in compliance with the stormwater management directives during the works phase described in the prefectural order and the environmental file) - watertight storage area, supply, implementation and removal of pumps, ..., reinstatement of the premises .... management of as-built plan, DOE, - Setting-out and topographical monitoring of the site, - Preparatory works - clearance of rights-of-way, - Brush clearing, felling and stump removal of trees, - Demolition of masonry, reinforced concrete, unreinforced concrete... - Demolition of masonry structures including fence - wicket gate - gate, .... - Earthworks, stripping of topsoil with stockpiling, removal of unsuitable material, excavation earthworks in ground ... of all kinds with disposal ...Topsoil from stockpiling, - Construction of concrete layers, ... asphalt concrete, curbs and sidewalk, pedestrian path - Longement, protective concrete for pipelines, adjustment of surface features to grade, plumbing, stormwater drainage networks, earthworks, excavations, PVC pipes and networks, HDPE pipes and networks, - Supply and installation of anchoring blocks, supply and installation of streetlights, electrical works .. The full descriptions are mentioned in the DCE ... Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.