Germany – Access road construction work – 1st construction phase – Connection of the Burg Industrial and Commercial Park to the supraregional road network
1. Clearing of the construction site of around 26,200 m², 2. Milling of approx. 2,000 m² of asphalt comprising surface, binder and base courses, 3. Excavation of around 9,300 m³ of soil / rock, 4. Construction of the road formation level over around 14,000 m², 5. Supply and installation of FSS for the carriageway
Opportunity description
1. Clearing of the construction site of around 26,200 m², 2. Milling of approx. 2,000 m² of asphalt comprising surface, binder and base courses, 3. Excavation of around 9,300 m³ of soil / rock, 4. Construction of the road formation level over around 14,000 m², 5. Supply and installation of FSS for the carriageway, around 4,250 m³, 6. Installation of STS for the carriageway, around 11,7500 m², 7. Supply and installation of ATS, ABS, ADS, around 11,000 m², 8. Construction of infiltration trench / swale with a length of approx. 2,400 m, 9. Extensive road-marking work comprising around 2,600 m of carriageway-edge markings plus block markings and centre-line markings, incl. inlaid markings, 10. Felling of around 100 trees of varying trunk diameters, 11. Approx. 3,200 m² of grass seeding, 12. Supply / installation of a culvert structure as an arch profile with a length of around 22 m, 13. Replacement measures A + E, 14. Approx. 1,500 m of drinking-water pipeline, W2 certification, 15. Approx. 1,500 m of cable trench for electrical systems. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.