Germany – Architectural, construction, engineering and inspection services – Staging installations for the Hambach inlet structure - General planning of structures
The construction of the Rhine water transport pipeline by RWE at the Hambach open-cast mine is progressing. The openly visible inlet structures are to be staged by Neuland Hambach GmbH and the process of water discharge is to be made accessible to the public g
Opportunity description
The construction of the Rhine water transport pipeline by RWE at the Hambach open-cast mine is progressing. The openly visible inlet structures are to be staged by Neuland Hambach GmbH and the process of water discharge is to be made accessible to the public. An office has already been commissioned to plan the outdoor facilities; for the structures, which are intended to provide a view of the water and space for initial infrastructure facilities, a planner is being sought here to undertake the structural design, structural engineering and planning of the technical equipment. To ensure that the design of the structures blends qualitatively into the surrounding open-space design and due to the challenging foundation situation, the planning team must also include a landscape architect and geotechnical expertise. SERVICE COMPONENTS The subject of the procurement procedure is the engineering services that must be provided as part of the structural design for the structures. Parts of these can already be found in the feasibility study by the office bauchplan ).(, which serves as the basis for this invitation to tender (see Annex 5). The following services are listed in detail. Further information can be found in Annex 2, Information Sheet on the Procedure, and Annex 3, Draft General Planner Contract. Structural design for civil engineering structures in accordance with HOAI Part 3, Section 3 § 41 et seq. Service phases 1 to 8, 9 optional Special services Structural design for outdoor facilities in accordance with HOAI Part 2, Section 2 § 39 et seq. Service phases 1 to 8, 9 optional Special services Specialist planning Structural engineering in accordance with HOAI Part 4, Section 1 §51 et seq. Service phases 1 to 6 Special services Specialist planning Technical equipment in accordance with HOAI Part 4, Section 2 §55 et seq. Service phases 1 to 8, 9 optional Special services Specialist consulting Geotechnics Design concept for the structures Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.