Germany – Architectural, construction, engineering and inspection services – Würzburg–Nuremberg corridor renovation / Planning services for ESTW-A Neustadt (Aisch)
The planned measure concerns the area of ESTW-A Neustadt (Aisch) in the section from km 32.0 to 42.0 of line 5910 in the Fürth–Würzburg high-performance corridor as part of the Würzburg–Nuremberg corridor renovation. The subject is the
Opportunity description
The planned measure concerns the area of ESTW-A Neustadt (Aisch) in the section from km 32.0 to 42.0 of line 5910 in the Fürth–Würzburg high-performance corridor as part of the Würzburg–Nuremberg corridor renovation. The subject is the comprehensive infrastructural adaptation of the transport facilities and technical equipment, divided into the following specialist lots: Specialist lot 1: Specialist planning for overhead contact lines, km 32.0–42.0 Specialist lot 2: Specialist planning for control-command and signalling technology, km 32.0–42.0 Specialist lot 3: Specialist planning for transport facilities at Neustadt junction (incl. through connection of track 7), Diebach passing loop and overall coordination Specialist lot 4: Specialist planning for 50 Hz systems technology Specialist lot 5: Specialist planning for Neustadt (Aisch) passenger stations Specialist lot 6: Specialist planning for structural engineering works – Diebach passing loop area Specialist planning for overhead contact lines, km 32.0–42.0 Specialist planning for control-command and signalling technology, km 32.0–42.0 Specialist planning for transport facilities at Neustadt junction (incl. through connection of track 7), Diebach passing loop and overall coordination Specialist planning for 50 Hz systems technology BIM specialist planning for Neustadt (Aisch) passenger stations Specialist planning for structural engineering works – Diebach passing loop area Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.