Germany – Architectural, construction, engineering and inspection services – Specialist Electrical Planning
Specialist Electrical Planning Specialist electrical planning for the Lindenschule in 65329 Hohenstein-Breithardt ELT - SCOPE OF SERVICES - Technical equipment - ELT system group, § 55 HOAI, basic services pursuant to Annex 15 (§ 56 HOAI 2021) System groups covered:
Opportunity description
Specialist Electrical Planning Specialist electrical planning for the Lindenschule in 65329 Hohenstein-Breithardt ELT - SCOPE OF SERVICES - Technical equipment - ELT system group, § 55 HOAI, basic services pursuant to Annex 15 (§ 56 HOAI 2021) System groups covered: - AG 4 - High-voltage installations (KG 440) - AG 5 - Telecommunications and information technology installations (KG 450) - AG 6 - Conveying systems / elevator system (KG 460) → Elevator planning is part of the specialist ELT planning - Fee calculation separately for each system group pursuant to HOAI SERVICE PHASES - LPH 1-9 (basic evaluation through to property supervision / documentation) - Phased commissioning: initially LPH 1-4; further commissioning for LPH 5-9 reserved FEE RATE - HOAI 2021 (fee tables as guidance); fee freely negotiable SPECIAL SERVICES / ADDITIONAL REQUIREMENTS - Existing-condition survey; assessment of the expandability of existing systems - Safety technology (ELA / BMA): assessment and anticipated replacement based on the new fire protection concept - Data network / information technology installations, tailored to the requirements of a special-needs school - Power supply for digital boards (in each classroom), kitchenettes, care equipment, ceiling lifts / rail system - Lighting: glare-free, dimmable, independent zone control (needs of bedridden and autistic pupils) - Elevator planning KG 460: elevator suitable for beds in the new stair tower, barrier-free access to all floors (DIN 18040-1) - CAFM documentation in accordance with the CAFM specifications (by the end of LPH 8 / acceptance for use) - Coordination with the existing structure (built in 1986, solid construction): shafts, lines, connection points Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.