Germany – Asbestos-removal work – Open procedure: VE 4 Hazardous-material remediation and dismantling work - Brilon School Center
At the school center in Brilon, consisting of the Heinrich-Lübke-Schule (HLS) and Gymnasium Petrinum (PET), hazardous-material contamination (PCB, KMF) was identified, whereupon a concept involving partial renovation, partial dismantling and partial new construction was develop
Opportunity description
At the school center in Brilon, consisting of the Heinrich-Lübke-Schule (HLS) and Gymnasium Petrinum (PET), hazardous-material contamination (PCB, KMF) was identified, whereupon a concept involving partial renovation, partial dismantling and partial new construction was developed. The hazardous-material remediation and demolition work put out to tender in this bill of quantities relates to the existing Gymnasium Petrinum building. This procurement unit predominantly involves renovation of the existing building. To meet the school’s needs, a solid-construction extension for the administration is planned on the ground floor, and an upper-school building using timber-frame construction will be erected on the 1st upper floor as a set-back storey. To construct the extensions, the existing building must be demolished in these areas. First, the respective construction phases must undergo hazardous-material remediation. Approx. quantities: Work in the white area: - Removal of wall tiles: 770.0 m2 - Removal of floor tiles: 200.0 m2 - Removal of bonded screed with artificial-stone slabs: 1,675.0 m2 Work in the black area: - Removal of suspended ceilings made of wooden boards: 5330.0 m2 - Removal of floating screed with impact-sound insulation: 5250.0 m2 - Removal of PCB-containing adhesive residue from screed: 4610.0 m2 Work on façade, windows, roof: - Removal of flat-roof waterproofing: 4,450.0 m2 - Removal of façade, window and door systems: 1,360.0 m2 - Removal of PCB-containing joint sealants: 1,200 m Structural dismantling: - Removal of the structural roof covering made of trapezoidal sheet metal: 4,450.0 m2 - Removal of solid sand-lime brick masonry walls: 3,180.0 m2 - Removal of reinforced-concrete walls in the façade and interior areas and other reinforced-concrete components: 1,545 m3 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.