Germany – Asbestos-removal work – Hazardous-material remediation and dismantling, Part 2
Hazardous-material remediation and dismantling, Part 2 • Removal and disposal of existing glazing • Removal and disposal of existing contaminated façade components • Remediation of existing listed and contaminated façades
Opportunity description
Hazardous-material remediation and dismantling, Part 2 • Removal and disposal of existing glazing • Removal and disposal of existing contaminated façade components • Remediation of existing listed and contaminated façade components • Removal of coatings from contaminated metal components • Removal and disposal of existing contaminated seals • Creation of component openings through contaminated façades • Verification work Building data: Existing BGF: 32.308 m² Existing BRI: 161.555 m³ New-build BGF: 3.577 m² New-build BRI: 18.161 m³ Usable floor area (NUF): approx. 28.425m² Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.