Germany – Bridge construction work – B3, Celle bypass, central section, 3rd construction phase, new construction Ce 20
The Federal Republic of Germany, represented by the Lower Saxony State Authority for Road Construction and Transport – Verden Division, plans to relocate Federal Highway 3 from northeast of Celle (B 191) to southeast of Celle (B 214) – Celle b
Opportunity description
The Federal Republic of Germany, represented by the Lower Saxony State Authority for Road Construction and Transport – Verden Division, plans to relocate Federal Highway 3 from northeast of Celle (B 191) to southeast of Celle (B 214) – Celle bypass, central section – from construction km 23+340 to construction km 28+645. As part of this project, 11 bridge structures are to be constructed for the Celle bypass. This construction description covers the construction of the structure "Bridge over the Freitagsgraben, Ce 20". Relocation of Federal Highway 3 from northeast of Celle (B191) to southeast of Celle (B214) – Celle bypass, central section – from construction km 23+340 to construction km 28+645. Here: 3rd construction phase. Approximate quantities for structure Ce20: Bridge area: 970m² Reinforced concrete: 800m³ Reinforcing steel: 175t Prestressed concrete: 560m³ Prestressing steel: 23t Procedure: open. Estimated value: 2,630,717 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.