Germany – Building construction work – New extension building for the Johann-Michael-Zeyher Primary School, Schwetzingen
Turnkey planning and construction of the new extension building for the Johann-Michael-Zeyher Primary School using modular timber construction on the municipal property at Schubertstraße 4 in 68723 Schwetzingen, including development and connection of the ou
Opportunity description
Turnkey planning and construction of the new extension building for the Johann-Michael-Zeyher Primary School using modular timber construction on the municipal property at Schubertstraße 4 in 68723 Schwetzingen, including the development and connection of the outdoor areas around the new building to the existing facilities. The City of Schwetzingen intends to expand the existing Johann-Michael-Zeyher Primary School site at Schubertstr. 4 with a new building using modular timber construction. For this purpose, with the use of funding, the Johann-Michael-Zeyher Primary School is to be expanded into an all-day school by means of a new extension building. The extension building has no direct connection to the existing primary school building, but, in addition to further classrooms, is intended to accommodate all-day care, incl. a cafeteria. The new building is to be positioned at an elevation that allows barrier-free and wheelchair-accessible entry from the existing school and the access road (spur road). The neighboring railway property is immediately adjacent. The primary school currently has two classes per grade with approx. 175 pupils. After expansion into an all-day school, it is to continue to have two classes per grade, with a maximum of 28 pupils per class. In addition, two preparatory classes (maximum 24 pupils per class) and, prospectively, a junior class (maximum 20 pupils) are also located at the Zeyher Primary School, so that at maximum full capacity, 292 pupils can be taught. The building structure is to be constructed as a three-story 3D modular timber building. The subject matter of the contract is the conceptual, approval, execution and detailed/workshop planning, together with the manufacture and turnkey construction of the school building, as well as the construction of the access routes and utility infrastructure, including the connection points around the building to the existing framework conditions and the existing schoolyard, which will remain unchanged. Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.