Germany – Building construction work – Installation of heating, ventilation and air-conditioning systems
BA 2 Existing Building HVAC System OG3 Meeting Room1 HVAC system 2,000 m³/h | Heating and cooling directly with refrigerant R329 ceiling displacement outlet supply air – 310 mm5 ceiling displacement outlet extract air – 310 mm9 volume flow controllers3 fans single-pipe ventilat
Opportunity description
BA 2 Existing Building HVAC System OG3 Meeting Room1 HVAC system 2,000 m³/h | Heating and cooling directly with refrigerant R329 ceiling displacement outlet supply air – 310 mm5 ceiling displacement outlet extract air – 310 mm9 volume flow controllers3 fans single-pipe ventilation system3 fire protection ceiling bulkheads DN 10050 m² galvanized ventilation ducts25 m² galvanized ventilation duct fittings10 m spiral duct DN 20015 m spiral duct DN 16015 m spiral duct DN 100 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.