Germany – Building construction work – New construction of the Antonienstraße building complex - Lot 07 Extension of structural shell and screed concrete
Extended structural shell and screed works Structural shell works Construction site setup Structural shell: - 1 lump sum construction site setup for all works - 1 unit 81 K.1 tower crane, provision Earthworks/groundworks: - approx. 1,075.00 m² blinding layer,
Opportunity description
Extended structural shell and screed works Structural shell works Construction site setup Structural shell: - 1 lump sum construction site setup for all works - 1 unit 81 K.1 tower crane, provision Earthworks/groundworks: - approx. 1,075.00 m² blinding layer, lean concrete, d = 5 cm - approx. 1,070.00 m² installation of polymer-bitumen welded membrane, 2-layer, PYE-PV 200 S5 Foundations and floor slab: - approx. 1,031.00 m² perimeter insulation beneath floor slab, d = 140 mm - approx. 105.00 m³ reinforced-concrete floor slab, C 30/37, XC2, XA1, WF, d = 140 cm, watertight, vehicle hall area - approx. 362.00 m³ reinforced-concrete floor slab, C 30/37, XC3, XD1, XF1, XA1, WF, d = 60 cm, watertight, vehicle hall area - approx. 46.00 m³ reinforced-concrete floor slab, C 30/37, XC3, XD1, XF1, XA1, WF, d = 120 cm, watertight, vehicle hall area - approx. 222.00 m³ reinforced-concrete floor slab, C 30/37, XC2, XA1, WF, d = 55 cm, watertight, technical services area Reinforced-concrete walls and columns: - approx. 400.00 m² exterior wall, C30/37, reinforced concrete, thickness 25 cm, height up to 6.60 m - approx. 516.00 m² exterior wall, C30/37, reinforced concrete, thickness 25 cm, height up to 3.20 m - approx. 820.00 m² reinforced-concrete interior wall, C30/37, XC1, WO, d = 25 cm - approx. 65.00 m² deep beam, exterior, 1st upper floor, C30/37, XC1, WO, d = 25 cm - approx. 25.00 m² deep beam, interior, ground floor, C30/37, XC3, XF1, WF, d = 25 cm - approx. 115.00 m² deep beam, interior, 1st upper floor to 2nd upper floor, C30/37, XC1, WO, d = 25 cm - approx. 56.00 m exterior column, C30/37, reinforced concrete, exposed concrete, rectangular, 25/80 cm, H = up to approx. 7.00 m - approx. 128.00 m exterior column, C30/37, reinforced concrete, exposed concrete, rectangular, 25/90 cm, H = up to approx. 3.20 m - approx. 56.00 m interior column, C30/37, reinforced concrete, exposed concrete, SB 2, square, 40/40 cm, H = approx. 7.00 m Reinforced-concrete slabs and downstand beams: - approx. 450.00 m² interior wall, calcium silicate, compressive strength class 12, d = 17.5 cm - approx. 145.00 m sliding ceiling connection, wall, d = 17.5 cm Reinforced-concrete staircase: - 1 unit reinforced-concrete stair flight, precast, C 30/37, d = 16 cm, 5.63 x 1.10 m - 6 units reinforced-concrete stair flights, precast, C 30/37, d = 16 cm, 3.63 x 1.465 m - approx. 4.50 m³ reinforced-concrete intermediate landing, cast in situ, C 30/37, d = 20 cm, 3.63 x 1.465 m - approx. 63.00 m Tronsole Type L, impact-sound insulation Embedded components: - approx. 10 units Isokorb for canopy, supply and install - approx. 12 units Isokorb for steel staircase, supply and install - approx. 45.00 m short anchor-channel sections, galvanized, profile 28/15 - approx. 16.00 m short anchor-channel sections, galvanized, profile 40/22 Reinforcement: - approx. 280.00 t reinforcing steel bars, d = 6 to 28 mm - approx. 3,165.00 kg reinforcing-steel support cages as spacers - approx. 27 units rebend connection, Type HBT 150, Type 5 Waterproofing works: - approx. 295.00 m² waterproofing, 2-component thick bituminous coating - approx. 395.00 m² primer coat, bitumen solution, wall surfaces, exterior PMBC coating - approx. 295.00 m² perimeter insulation, 100 mm, XPS - approx. 295.00 m² dimpled membrane with fleece, exterior walls in contact with soil Other works: - approx. 190.00 m² temporary closure of openings Lightning-protection and earthing systems Foundation earth electrode / functional earth electrode: - approx. 250.00 m foundation earth electrode / functional earth electrode - approx. 100 units connection clamps D - approx. 75 units connection clamps DM - approx. 50 units connection clamps DM1 - approx. 25 units connection clamps T/K ring earth electrode / external earth electrode: - approx. 775.00 m flat earthing conductor - approx. 225 units earthing clamps (SV clamps), flat/flat - approx. 175 units earthing clamps (SV clamps), round/flat - approx. 210 units UNI earthing clamps Building entry/concrete conduit system Building entry: - 1 unit double sealing pack for casting into concrete, 3 x 5 Concrete conduit system: - approx. 65.00 m medium-duty corrugated plastic conduit; flexible; DN 40 - approx. 450.00 m medium-duty corrugated plastic conduit; flexible; DN 32 - approx. 120 units device junction boxes for conduits up to DN 40 - approx. 31 units end and transition sleeves, for M 32 conduits - approx. 85 units end and transition sleeves, for M 40 conduits Drainage sewer works Pipe trenches: - approx. 80.00 m³ excavation up to 1.0 m deep - approx. 30.00 m³ excavation up to 1.5 m deep - approx. 50.00 m³ pipe-trench installation Sewer pipes and accessories: - approx. 30.00 m KG 2000 pipe, DN 100, laying - approx. 30 units fitting as an extra for rigid PVC pipe - elbow DN100 - approx. 7 units fitting as an extra for rigid PVC pipe - branch DN 100 Seals: - approx. 2 units sleeve pipe, internal diameter = 200 mm - approx. 2 units sleeve pipe, internal diameter = 250 mm - approx. 1 unit sealing package Drinking water Drinking-water connection Drinking water: - approx. 30.00 m PE100 pipeline SDR 11 50 x 4.6 - 1 lump sum pressure test Screed works Screed works: - approx. 1,055.00 m² PE foam edge strips, film flap, 120 to 200 mm - approx. 1,840.00 m² dry fill, perlite, 80 mm - approx. 2,080.00 m² impact-sound insulation, EPS 040 DES sg, 30 mm - approx. 690.00 m² cement screed, floating, 75 mm, CT-F4-S75 - approx. 1,250.00 m² cement screed, floating, 80 mm, CT-F4-S80 Interior plaster Interior plastering works: - approx. 2,280.00 m² mineral bonding bridge for concrete walls - approx. 2,405.00 m² gypsum plaster, Q2 smoothed - approx. 1,550.00 m² reinforcing mesh for gypsum plaster - approx. 675.00 m² lime-cement plaster, workshop area Scaffolding Stairwell: - approx. 192.00 m³ spatial scaffold, working scaffold, LK 3, stairwell Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.