Germany – Building construction work – Conversion and extension of the National Park School, "Ostseeblick" Primary School, Schulstraße 5, 18545 Sassnitz, Lot 22 Screed works, ZE
Construction works in accordance with the bill of quantities FA6 - Cement screed in the boiler room, p=<3.0 kN/m² Clean substrate, coarse dirt 50 m² FA6 - Cement screed, d=60 mm, floor coating 50 m² Screed for extension and connecting building Elevation survey 1 lump sum Clea
Opportunity description
Construction works in accordance with the bill of quantities FA6 - Cement screed in the boiler room, p=<3.0 kN/m² Clean substrate, coarse dirt 50 m² FA6 - Cement screed, d=60 mm, floor coating 50 m² Screed for extension and connecting building Elevation survey 1 lump sum Clean substrate, coarse dirt 930 m² Insulation beneath heated screed, 90 mm 270 m² Thermal insulation, EPS, 40 mm, pipe height compensation beneath screed 25 m² Thermal insulation, EPS, 30 mm, screed 13.5 m² Thermal insulation, EPS, 20 mm, screed 56 m² Thermal insulation, EPS, 20 mm, screed 92 m² Vapor barrier, PE film, 0.2 mm, screed 930 m² Edge strips made of polystyrene, h= 100 mm 645 m FN1, heated screed, d= 87 mm, lino covering 190 m² FN2 heated screed, d= 82 mm, tiles 16 m² FN3+FN4 heated screed, d= 80 mm, tiles 73 m² FN5+FN6 heated screed, d= 85 mm, tiles 490 m² FN7 heated screed, d= 78 mm, tiles 7 m² FN9 cement screed, d= 78 mm, tiles 12.5 m² FN8 cement screed,, d= 70 mm, tiles 92 m² FN12 cement screed, d= 87 mm, linoleum 16 m² FN10 + FN11, cement screed, d= 72 mm, tiles 15 m² Surcharge for 20 mm reduction in the foot-wiping area 6 m² Divider rails 10 m Screed formwork, h= up to 250 mm 11 m Formwork for recess in screed 40 x 40 FE 4 pcs Surcharge for forming local slope, each approx. 1m2 4 pcs Form dummy joints 60 m Form separating joints (sound insulation), mobile partition wall 9 m Surcharge for forming separating joints (sound insulation) on both sides 9 m Form movement joint 15 m Form separating joints (sound insulation), door areas 11 m Rapid-setting screed 930 m² Floor construction in showers for the sports hall Remove floor tiles with screed 75 m² Clean substrate, coarse dirt 75 m² Floor thermal insulation layer PS rigid foam EPS 035 DEO dm, D 50 mm 60 m² Impact sound insulation beneath screed, 18 mm, max s`≤30MN/m² 75 m² FN15, cement screed, bonded screed, ceramic covering, C25, 100 mm 40 m² FN16, cement screed, bonded screed, ceramic covering, C25, 93 mm 7 m² FN17, cement screed, bonded screed, ceramic covering, C25, 93 mm 14 m² Entrance mats Cutting and removal of the floor construction 11 m² Thermal insulation, EPS, 40 mm, screed 17 m² Cement screed, d= 55 mm, beneath entrance mats 17 m² Aluminum profile mats + frame, approx. 2,900 x 1,500 mm, foyer 1 pc Aluminum profile mats + frame, approx. 1,880 x 1,500 mm, vestibule 1 pc Aluminum profile mats + frame, approx. 2,540 x 1,500 mm, exit 1 pc Aluminum profile mats + frame, approx.1,650 x 1,500 mm, connecting corridor 1 pc Aluminum profile mats + frame, approx.2,010 x 1,500 mm, extension corridor 1 pc Construction work in accordance with the bill of quantities Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.