Germany – Building construction work – Conversion and extension of the National Park School, "Ostseeblick" Primary School, Schulstraße 5, 18545 Sassnitz
Construction work in accordance with the bill of quantities Mastic asphalt screed Levelling layer on existing ceilings Elevation survey 1 lump sum Clean substrate, coarse dirt 1860 m² Substrate preparation, concrete milling 1860 m² Epoxy resin with quartz sand 1860 m²
Opportunity description
Construction work in accordance with the bill of quantities Mastic asphalt screed Levelling layer on existing ceilings Elevation survey 1 lump sum Clean substrate, coarse dirt 1860 m² Substrate preparation, concrete milling 1860 m² Epoxy resin with quartz sand 1860 m² Bonding bridge 1860 m² Corrosion protection, 300 pcs. PCC I/RM mortar, coating thickness approx. 6 mm 370 m² PCC I/RM mortar, coating thickness approx. 15 mm 370 m² PCC I/RM mortar, coating thickness approx. 20 mm 370 m² PCC I/RM mortar, coating thickness approx. 30 mm 370 m² PCC I/RM mortar, coating thickness approx. 10 mm 1860 m² PCC I/RM mortar, coating thickness approx. 40 mm 95 m² PCC I/RM mortar, coating thickness approx. 50 mm 95 m² PCC I/RM mortar, coating thickness approx. 60 mm 95 m² PCC I/RM mortar, coating thickness approx. 80 mm 95 m² FA1 - Floor on sub-concrete, p=<3.0 kN/m² Perlite insulation boards, EPB, 50 mm, asphalt screed 100 m² Separating layer of untreated roofing felt 100 m² Edge strips, corrugated cardboard 60 m Mastic asphalt screed on insulation, AS 8 IC 10 T30, 100 m² Remove sanding, mastic asphalt screed 100 m² FA2 - Floor on existing ceiling structure, p=<3.0 kN/m² Separating layer of untreated roofing felt 1165 m² Edge strips, corrugated cardboard 475 m Mastic asphalt screed on separating layer, AS 3 IC 10 T30, 1165 m² Remove sanding, mastic asphalt screed 1165 m² FA3 - Floor on existing ceiling structure, p=<3.0 kN/m², sanitary rooms Separating layer of untreated roofing felt 110 m² Edge strips, corrugated cardboard 110 m Mastic asphalt screed on separating layer, AS 3 IC 10 T30, 110 m² Remove sanding, mastic asphalt screed 110 m² Supplement for forming local slopes of approx. 1m2 each 4 pcs. Formwork for recess in screed 40 x 40 FE 4 pcs. Install floor drain 4 pcs. FA4 - Floor on existing ceiling structure, p=<5.0 kN/m², corridors Separating layer of untreated roofing felt 410 m² Edge strips, corrugated cardboard 210 m Mastic asphalt screed on separating layer, AS 8 IC 10 T35, 410 m² Remove sanding, mastic asphalt screed 410 m² FA5 - Floor on existing ceiling structure, p=<3.0 kN/m²; student kitchen Separating layer of untreated roofing felt 60 m² Edge strips, corrugated cardboard 36 m Mastic asphalt screed on separating layer, AS 3 IC 10 T30, 60 m² Remove sanding, mastic asphalt screed 60 m² FN13, corridor ramp connecting passage Impact sound insulation, 25-2 mm as multilayer insulation boards 45 m² Separating layer of untreated roofing felt 60 m² Edge strips, corrugated cardboard 80 m Mastic asphalt screed on separating layer, AS 5 IC 10 T37, 36 m² Mastic asphalt screed on ramps 5-6% 24 m² Remove sanding, mastic asphalt screed 60 m² Ramp construction in the old building, room 215.1 7 m² Infill, room 215.2 + 214 19 m² Finishing around reinforced-concrete column Ø 20 cm 5 pcs. Miscellaneous Separating rails 30 m Screed formwork, h= up to 50 mm 45 m Construct movement joint 20 m Additional or reduced thickness per 5 mm 100 m² Angle section L 180 / 90 / 10 mm 12 m Angle section L 110 / 110 / 10 mm 1.5 m Angle section L 150 / 100 / 10 mm 13 m Perlite fill 10 mm 100 m² Perlite fill 20 mm 100 m² Wood-fibre insulation board 8 mm 100 m² Wood-fibre insulation board 20 mm 100 m² Construction work in accordance with the bill of quantities Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.