Germany – Building installation work – Heating, ventilation and plumbing with building automation, Bernburger Straße School
Heating, ventilation and plumbing with building automation In all trades, shut-off and control devices, equipment, fire protection measures, insulation work, fastenings, balancing, functional testing, measurement records and documentation. Sanitary: pipes TW WW RW SW DN
Opportunity description
Heating, ventilation and plumbing with building automation In all trades, shut-off and control devices, equipment, fire protection measures, insulation work, fastenings, balancing, functional testing, measurement records and documentation. Sanitary: pipes TW WW RW SW DN DN12 - DN200 approx. 3,800 m, Heating: pipes DN12-DN150 around 4,000m. Outdoor installation of 2 x air-to-water heat pumps (HP) R290, each 110 kW th; 1 x dry cooler, 90 kW th; Indoor installation of 2 x brine-to-water HP R290, each 40 kW th, 3 x brine-to-water HP R290, each 56 kW th, 1 x water-to-water HP R600a, with 190 kW th. Ventilation: AHU 1.1 18,400 m³/h / 18,400 m³/h; AHU 1.2 16,850 m³/h / 16,850 m³/h; AHU 1.3 7,150 m³/h / 6,900 m³/h; AHU 2.1 16,800 m³/h / 16,800 m³/h; ; AHU 4.1 / 12,020 m³/h / 12,020 m³/h; AHU 4.2 / 12,866 m³/h / 12,100 m³/h; AHU 3.1 1,600 m³/h / 1,600 m³/h 14 x AHU systems, each 900 m³/h, in classrooms. Incl. around 7,700 m² of ductwork with fittings, volume flow controllers, silencers, air outlets, weather protection grilles, exhaust-air and outdoor-air connections. Building automation: 13 automation control centers, approx. 62,000 m of cables Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.