Germany – Canal construction – Development of the Oberhalb der Bahn industrial estate, Gerstungen, 2nd construction phase - Lot 5 - Conversion of the "Schwarzer Tunnel" - Connection to the upstream network
Earthworks and canal construction Installation and laying of foul-water + stormwater canals in the area of the existing tunnel on the tunnel floor - approx. 920 m2 KDB, drainage mat - approx. 100 m3 levelling layer made of cement screed - approx. 162 m stormwater canal DN 800 GRP on steel substructure
Opportunity description
Earthworks and canal construction Installation and laying of foul-water + stormwater canals in the area of the existing tunnel on the tunnel floor - approx. 920 m2 KDB, drainage mat - approx. 100 m3 levelling layer made of cement screed - approx. 162 m stormwater canal DN 800 GRP on steel substructure - approx. 162 m foul-water canal DN 300 GRP on steel substructure - approx. 1,200 m3 phased cavity filling with flowable fill - approx. 6 m3 brickwork closure made of clinker masonry Laying of foul-water + stormwater canals outside the tunnel in the canal trench - approx. 50 m stormwater canal DN 800 GRP - approx. 50 m foul-water canal DN 250 PP - approx. 1 manhole structure for foul water + stormwater with cast-in-place concrete C25/30 lining - approx. 140 m2 access route with AC16TD asphalt construction Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.