Germany – Carpentry installation work – Conversion and extension of the Bautzen District Music School, Lot 319-1: Carpentry work for the hall
Conversion and extension of the Bautzen District Music School, Lot 319-1: Carpentry work for the hall, Bautzen District Music School. The former administrative building at Tzschirnerstraße 14a is to be converted and extended to become the District Music School. The existing building
Opportunity description
Conversion and extension of the Bautzen District Music School, Lot 319-1: Carpentry work for the hall, Bautzen District Music School. The former administrative building at Tzschirnerstraße 14a is to be converted and extended to become the District Music School. The existing building (old building from 1912 with an extension from 2001) will be retained and spatially restructured to meet the new requirements. A newly built concert hall will be connected to the rear of the existing building. (Total usable floor area approx. 1870 m2). Furthermore, the outdoor facilities will be extensively redesigned at the same time and thus designed to suit the new use. Bill of quantities contents: Lot 319-1 Carpentry work for the hall: 1.00 lump sum workshop and installation drawings for wall cladding / plinth zone of concert hall and ground-floor foyer; 52.00 m2 wall cladding made of A2 laminated veneer lumber panel on substructure with mineral wool backing; 14.00 m2 ceiling cladding made of A2 laminated veneer lumber panel on substructure with mineral wool backing; 105.00 m2 folded plinth-zone cladding made of laminated veneer lumber panel on substructure; 70.00 m2 folded plinth-zone cladding made of slotted laminated veneer lumber panel on substructure; 95.00 m2 additional charge for insulation behind the folded wall panels, plinth zone; 420.00 m support profiles for plinth-zone wall cladding; 172.00 m support profiles for wall cladding, connection at the high point and low point; 80.00 m support profiles for plinth-zone wall cladding, skirting board; 150.00 m support profiles for plinth-zone wall cladding, upper termination; 82.00 m support profiles for plinth-zone wall cladding, reveals; 4.00 pcs plinth-zone cladding, wood-based material, oak, false door HxW = 2100x1020mm; 72.00 m skirting board, wood-based material, oak, d=16mm, height h=140mm; 55.00 m reveal frame, wood-based material, oak, d=40mm, w=520mm; 50.00 m skirting-board duct for heating pipes; 250.00 m joint cover strips, rectangular strip; 150.00 m joint cover strips, angle strip. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.