Germany – Central-heating installation work – Fürstenwalder Allee_Gas, water and drainage installations within buildings_Heating and sanitary works
4 heat pumps as a cascade, each with 16 kW 500 m piping system, stainless-steel press fittings DN 15-DN 65 plus fittings 2400 m piping for industrial underfloor heating with accessories 6300 m underfloor heating for recreation rooms with accessories 4 heating walls
Opportunity description
4 heat pumps as a cascade, each with 16 kW 500 m piping system, stainless-steel press fittings DN 15-DN 65 plus fittings 2400 m piping for industrial underfloor heating with accessories 6300 m underfloor heating for recreation rooms with accessories 4 heating walls 280 m stainless-steel piping system for drinking water DN 12-DN 50 plus fittings 9 toilet installations 9 washbasins 7 urinals 10 shower panels with connection to water management system 11 washbasin, kitchen and utility sink fittings with connection to water management system 8 water heaters from 6.5 to 2x27 kW Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.