Germany – Central-heating installation work – HS MW, New Library Building
Heating and cooling technology - 5 pcs. pumps - 2 pcs. plate heat exchangers for concrete core temperature control, heating/cooling approx. 83/103 kW - 1 pc. spray-pipe vacuum degasser - 2 pcs. distributors/collectors - approx. 1.754 m of steel heating-water piping in
Opportunity description
Heating and cooling technology - 5 pcs. pumps - 2 pcs. plate heat exchangers for concrete core temperature control, heating/cooling approx. 83/103 kW - 1 pc. spray-pipe vacuum degasser - 2 pcs. distributors/collectors - approx. 1.754 m of steel heating-water piping incl. fittings - approx. 360 m of multilayer composite heating-water piping incl. fittings - approx. 1.364 m of steel chilled-water piping incl. fittings and corrosion protection - approx. 700 pcs. valves, strainers and pipe fittings - approx. 2.074 m of thermal insulation on piping - approx. 1.364 m of cold insulation on piping - approx. 252 pcs. terminal systems (underfloor convectors, radiators, air curtains, fan coil units) - 16 pcs. heating circuit distributors for concrete core temperature control Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.