Germany – Construction-site supervision services – 25FEI84132 Construction supervision Fehmarn Sound Crossing (FSQ) Lots 1 - 13
The project comprises the planned Fehmarn Sound Crossing as a combined immersed tunnel as well as its mainland-side and island-side connections, extending on the mainland to Großenbrode and on Fehmarn to north of Strukkamp. The road will have four lan
Opportunity description
The project comprises the planned Fehmarn Sound Crossing as a combined immersed tunnel as well as its mainland-side and island-side connections, extending on the mainland to Großenbrode and on Fehmarn to north of Strukkamp. The road will have four lanes (two tunnel tubes), and the railway will have two tracks (also two tunnel tubes). The combined immersed tunnel for rail and road is being jointly planned and implemented by the project sponsors DB InfraGO AG and DEGES. The project will be implemented by means of Integrated Project Delivery (IPA) "Allianz FSQ“, based on the so-called “Rail Partnership Model (PM-Schiene)”. - Lot 1: Lead construction supervision & track superstructure / Structural engineering works - Lot 2: Road construction supervision - Lot 3: Environmental construction supervision - Nature & water protection, landscaping - Lot 4: Environmental construction supervision - Immission control - Lot 5: Specialist construction supervision for waste - Lot 6: Environmental construction supervision - Soil science construction monitoring - Lot 7: Geotechnical construction supervision - Lot 8: Construction supervision - Technical equipment for tunnel + road + operations building (operational technology (BT) / traffic technology (VT) / telecommunications technology (FM)) - Lot 9: Construction-related surveying/drone flights - Lot 10: SiGeKo - Lot 11: Construction supervision of overhead contact line systems (OLA) - Lot 12: Construction supervision of electrical power systems (EEA) 50 Hz - Lot 13: Environmental construction supervision - Offshore LOT 1 - Lead construction supervision + track superstructure/structural engineering works LOT 2 - Road construction supervision LOT 3 - Environmental construction supervision - Nature conservation & water protection & landscaping LOT 4 - Environmental construction supervision - Immission control LOT 5 - Specialist construction supervision for waste LOT 6 - Environmental construction supervision - Soil science construction monitoring LOT 7 - Geotechnical construction supervision LOT 8 - Construction supervision of technical equipment for tunnel + road + operations building LOT 9 - Construction-related surveying + drone flights LOT 10 - SiGeKo LOT 11 - Construction supervision of overhead contact line systems (OLA) LOT 12 - Construction supervision of electrical power systems (EEA) 50 Hz LOT 13 - Environmental construction supervision - Offshore Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.