Germany – Construction work – Federal Foreign Office - Conversion and extension - Drywall work including metal grid ceilings - Procurement 1435/2023
Federal Foreign Office Conversion and extension Kurstraße 33 Werderscher Markt 1, 10117 Berlin Drywall work including metal grid ceilings DIN 18360, 18340 KKE 332.01 VE 26-2 Drywall work including metal grid ceilings DIN 18360, 18340 KKE 332.
Opportunity description
Federal Foreign Office Conversion and extension Kurstraße 33 Werderscher Markt 1, 10117 Berlin Drywall work including metal grid ceilings DIN 18360, 18340 KKE 332.01 VE 26-2 Drywall work including metal grid ceilings DIN 18360, 18340 KKE 332.01 VE 26-2 Description: Brief description of the contract • Enclosures as preparatory work for façade construction • Installation of non-load-bearing interior walls using drywall construction • Wall linings and shaft walls • Installation of suspended plasterboard ceilings • Installation of metal ceilings Quantity or scope of the contract Total quantity or scope: • Interior walls: total approx. 2360 m², some incl. insulation layers and fire protection requirements, and some with impregnation • Wall linings and shaft walls: total approx. 1800 m², • Suspended plasterboard ceilings: total approx. 1515 m², some incl. insulation layers and fire protection requirements and some with impregnation • Metal ceilings: total approx. 280 m², some incl. insulation layers and fire protection requirements Dates: Start of execution: August 2026 End of execution: November 2027 binding individual deadlines: Building sections 4 and 5, shop and installation planning, material scheduling Start 19.08.2026 Completion 09.09.2026 Building sections 4 and 5, enclosures as preparatory work for façade construction Start 09.09.2026 Completion 12.10.2026 Interruption of service provision at the construction site Start 13.10.2026 End 03.03.2027 Building sections 4 and 5, further services Start 03.03.2027 Completion 30.11.2027 Shop and installation planning, material scheduling for the metal ceilings scope of work (5.5 months) Start 25.03.2027 Completion 15.09.2027 Building sections 4 and 5, installation of metal ceilings in corridors Start 15.09.2027 Completion 30.11.2027 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.