Germany – Construction work – Main construction works Cecilienhof Palace
Main construction works - Site setup and protective measures - Demolition and dismantling work - Earthworks (approx. 160 m3) - Shoring (approx. 160 m2) - Work on underground drainage pipes (approx. 560 m) - Waterproofing work in the interior (approx. 2,500 m2) and exte
Opportunity description
Main construction works - Site setup and protective measures - Demolition and dismantling work - Earthworks (approx. 160 m3) - Shoring (approx. 160 m2) - Work on underground drainage pipes (approx. 560 m) - Waterproofing work in the interior (approx. 2,500 m2) and exterior (approx. 230 m2) of the building - Concrete work (approx. 1,200 m2) - Foundation work and installation of micropiles (27 units, length up to 8.0 m) - Masonry work: create/adapt approx. 50 door/wall openings - Repair masonry - Installation of new steel beams and lintels (approx. 80 units, length approx. 1.50 m) - Reinforce steel beams (approx. 750 m) - Create/close wall and ceiling penetrations (approx. 130 units) - Close core drill holes (approx. 500 units) - Seal cracks (approx. 250 m) - Recondition masonry blocks (approx. 6 m3) - Screed work incl. insulation (approx. 1,930 m2) - Mastic asphalt work (approx. 430 m2) - Interior plastering work, approx. 600 m2 ceiling plaster, approx. 2,900 m2 renovation plaster, approx. 200 m2 lime plaster - Closing chases (approx. 6,000 m) Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.