Germany – Construction work – Master builder works
Earthworks:Remove existing gravel strip, approx. 135 m2Dismantle and dispose of concrete stone edging, approx. 140 mSupply and install river gravel 16/32, approx. 225 mSupply and install frost-protection crushed stone 0/56, approx. 120 m3Waterproofing work:Atta
Opportunity description
Earthworks:Remove existing gravel strip, approx. 135 m2Dismantle and dispose of concrete stone edging, approx. 140 mSupply and install river gravel 16/32, approx. 225 mSupply and install frost-protection crushed stone 0/56, approx. 120 m3Waterproofing work:Install 120-140 mm XPS insulation on plinth, approx. 215 m2Waterproof wall plinth with thick bituminous coating, approx. 215 m2Excavation / exposure of basement floor, approx. 300 m3Waterproof wall surface with thick bituminous coating, approx. 180 m2Perimeter insulation of external basement wall, approx. 180 m2Protective layer for waterproofing, dimpled membrane, approx. 180 m2Concrete work:Concrete elevator shaft:Cast-in-place concrete floor slab, approx. 2 m3Parapet, approx. 2.5 m3Shaft wall, approx. 23 m3Ceiling slabs, approx. 3 m3Disposal:Soil and stones, AVV 170504, approx. 550 toConstruction rubble material (AVV No. 170101, 170102, 170103, 17010), approx. 75 toBiodegradable waste, AVV 200201, 10 to Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.