Germany – Construction work – Brainergy Park Energie GmbH regarding technical building services—plumbing for the energy center
On the site of the former transmission facility on the outskirts of Jülich and in the immediate vicinity of the FH Aachen campus, a science park and innovative commercial area covering approx. 52 ha is currently being developed (hereinafter: “Brainergy
Opportunity description
On the site of the former transmission facility on the outskirts of Jülich and in the immediate vicinity of the FH Aachen campus, a science park and innovative commercial area covering approx. 52 ha is currently being developed (hereinafter: “Brainergy Park Jülich”). The contracting authority is responsible for supplying heat to the properties in Brainergy Park. The buildings are to be supplied with heat via an almost CO₂-neutral district heating system. This water-filled LowEx network is operated by a central energy center that provides cooling in summer and heat in winter. The heat is provided locally by heat pump systems housed in containers. On the property of Brainergy Park Energie GmbH in Brainergy Park in Jülich, an energy center is being constructed as a new timber building as part of the expansion of the heating network. The new building is divided into a hall and a 3-story structure. On the ground floor, there is the low-voltage system with sub-distribution, storage, telecommunications, a utility room with heating, and access to the office area on the 1st and 2nd upper floors with 14 workstations, a meeting room, kitchenette, loggias, and sanitary facilities. The subject of this procurement procedure is the manufacture, delivery, and installation of the sanitary systems for the energy center. On the site of the former transmission facility on the outskirts of Jülich and in the immediate vicinity of the FH Aachen campus, a science park and innovative commercial area covering approx. 52 ha is currently being developed (hereinafter: “Brainergy Park Jülich”). The contracting authority is responsible for supplying heat to the properties in Brainergy Park. The buildings are to be supplied with heat via an almost CO₂-neutral district heating system. This water-filled LowEx network is operated by a central energy center that provides cooling in summer and heat in winter. The heat is provided locally by heat pump systems housed in containers. On the property of Brainergy Park Energie GmbH in Brainergy Park in Jülich, an energy center is being constructed as a new timber building as part of the expansion of the heating network. The new building is divided into a hall and a 3-story structure. On the ground floor, there is the low-voltage system with sub-distribution, storage, telecommunications, a utility room with heating, and access to the office area on the 1st and 2nd upper floors with 14 workstations, a meeting room, kitchenette, loggias, and sanitary facilities. The subject of this procurement procedure is the manufacture, delivery, and installation of the sanitary systems for the energy center. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.