Germany – Construction work – Federal Agency for Real Estate Tasks - Complete renovation of the BImA office - Roof waterproofing and sheet-metal work - Procurement 824/2026
Federal Agency for Real Estate Tasks, Fasanenstraße 87, 10623 Berlin Complete renovation of the BImA office Roof waterproofing and sheet-metal work - DIN 18336, 18339 - VE300.30 Roof waterproofing and sheet-metal work - DIN 18336, 18339 - VE300
Opportunity description
Federal Agency for Real Estate Tasks, Fasanenstraße 87, 10623 Berlin Complete renovation of the BImA office Roof waterproofing and sheet-metal work - DIN 18336, 18339 - VE300.30 Roof waterproofing and sheet-metal work - DIN 18336, 18339 - VE300.30 Description: Demolish 33 m² zinc-sheet metal roofing incl. under-roof Demolish 140 m cornice covering Demolish 10 m parapet covering Transport and dispose of 9 t non-hazardous waste Roof areas Clean 2353 m² roof areas, primer, vapor barrier, 2353 m² insulation made of MW d= 200 mm or 140 mm 2353 m² 2-layer bituminous roof waterproofing 423 m rigid, insulated wall junction 250 m insulated edge termination 20 m² ballast made of concrete slabs 108 m² tapered insulation layer PUR-PIR D 80 mm 135 m rigid, insulated wall junction 300 pcs. thermal insulation layer, adapt roof waterproofing to penetrations 2100 m² construction protection mats on roof areas Terraces Clean 590 m² roof area, primer, vapor barrier 335 m² tapered insulation layer PUR/PIR D 170 mm or D 200 mm 335 m² 2-layer bituminous roof waterproofing 445 m rigid, insulated wall junction 255 m² tapered insulation layer PUR/PIR D 50 mm for eaves 70 pcs. thermal insulation layer, adapt roof waterproofing to penetrations 200 m rigid wall junction FLK 250 m² protective layer construction protection mat Cornice Clean 140 m² cornice surfaces, primer, vapor barrier 140 m² tapered insulation layer PUR/PIR D 80 mm 140 m² 2-layer bituminous roof waterproofing 135 m rigid insulated wall junction 1 pc. heat extraction device with mounting curb incl. control system 385 pcs. connection to pipe penetrations, rod-shaped penetrations 300 m traversable anchor safety system 20 pcs. individual anchor points 1400 m overhang strips 278 m titanium-zinc wall covering 385 m eaves covering B1250 mm 26 m eaves covering B900 mm 300 m edge termination 5 pcs. door threshold covering 300 m cornice covering B1000 mm 805 m suspended titanium-zinc gutter 50 pcs. titanium-zinc water collector box size 120 482 m rainwater downpipe size 120 mm 100 pcs. pipe elbow 72 degrees 28 pcs. pipe outlet 250 m temporary drainage plastic pipe Dates: Start of execution within 12 working days after receipt of the request from the contracting authority; the request is expected to reach you by 03.08.2026. Completion within 260 WT Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.