Germany – Construction work – Bundesrat - Extension with Visitor Centre - Steel and Metal Construction Work - Procurement 525/2026
Bundesrat - Extension with Visitor Centre - Leipziger Str. 3-4, D-10117 Berlin Steel/metal construction work - DIN 18360,18361,18363 - Steel construction III, tubular-frame doors - VE 3-09.3 VE 3-09.3 Steel construction III - tubular-frame doors On the property at Leipziger S
Opportunity description
Bundesrat - Extension with Visitor Centre - Leipziger Str. 3-4, D-10117 Berlin Steel/metal construction work - DIN 18360,18361,18363 - Steel construction III, tubular-frame doors - VE 3-09.3 VE 3-09.3 Steel construction III - tubular-frame doors An extension to the Bundesrat with a visitor centre is being constructed on the property at Leipziger Straße 2 in Berlin-Mitte. The building is divided into a 5-storey head building and an L-shaped, 6-storey administrative wing. 1. Type and scope of the work: Single- and double-leaf door elements, factory-coated with a finished surface, with various built-in components and fittings. approx. 26 steel sheet doors without and with fire protection requirements T0/T30-RS/T90 approx. 12 steel/glass tubular-frame doors without fire protection requirements, approx. 4 aluminium/glass tubular-frame doors without fire protection requirements approx. 13 aluminium/glass tubular-frame doors as smoke-control doors approx. 29 aluminium/glass tubular-frame doors with fire protection requirements T30-RS approx. 12 aluminium/glass tubular-frame doors with fire protection requirements T90-RS approx. 23 inspection-opening closures with fire protection requirement T90-RS approx. 61 lintel door panels, coated with a finished surface Maintenance services are part of the invitation to tender – term: 4 years 2. Performance deadlines: Start of performance: 06/2026 Completion/duration: 02/2028 Binding individual deadlines 3. Note on BNB certification Silver BNB certification is being sought for the project. The contractor must contribute to successful certification. For this purpose, the contractor must comply during construction with the relevant requirements concerning low waste, low noise and low dust, as well as the requirements pursuant to the Federal Soil Protection and Contaminated Sites Ordinance. Compliance with the requirements must be demonstrated to the contracting authority in the form of site inspection records prepared at least monthly. A template for the site inspection record is enclosed with the procurement documents as an annex. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.